Forwards Insp Rept 50-458/87-06 on 870223-27 & Notice of Violation.Three Observed Deficiencies in Emergency Preparedness Program Also Identified in Rept.Schedule for Correcting Deficiencies Requested within 30 Days
ML20205B841
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/23/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
Shared Package
ML20205B845 List:
References
NUDOCS 8703300054
Download: ML20205B841 (2)


See also: IR 05000458/1987006

Text

, o .

In Reply Refer To: ,

Docket: 50-458/87-06

&!AR L 313a/

Gulf States Utilities

ATTN: Mr. James C. Deddens

Senior Vice President, (RBNG)

Nuclear Licensing

P. O. Box 220

St. Francisville, Louisiana 70775

Gentlemen:

This refers to the inspection conducted by Nemen M. Terc of this office during

the period February 23-27, 1987, of activities authorized by NRC Operating

License NPF-47 for River Bend Station, and to the discussion of our findings

with you and members of your staff at the conclusion of the inspection.

Areas examined during the inspection included the implementation of the

emergency plan and procedures during the annual emergency response exercise.

Within these areas, the inspection conti '

d of selective examination of

procedures and representative records im tviews with personnel, and

observations by the NRC inspectors. The inspection findings are documented in

the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

The enclosed report identifies three observed deficiencies in your emergency

'

preparedness program. You are requested to provide this office a schedule for

correcting these deficiencies within 30 days after receipt of this letter.

We also examined actions you have taken with regard to previously identified

inspection findings. The status of these items is identified in paragraph 2 of

the enclosed report.

The responses required and requested by this letter are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

i

&SPS C:R&SPb- CR /A C:RPBf

/tw C:EP&

LAYand SIS,f,

e WLFisher JPJaudon JEGag ria do

3/lb/87 6/6/87 3 /I6/87 *2

y l;f/87 7/

\ '\ h

t

8703300054 B70323 /

PDR ADOCK 05000450

G PDR

h[/

. . .

Gulf States Utilities -2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Drlcin3! S!cned By

Ll. E. Gaellardo

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-458/87-06

cc w/ enclosures:

Gulf States Utilities

ATTN: J. E. Booker, Manager-

River Bend Oversight

P. O. Box 2951

Beaumont, Texas 77704

Louisiana State University,

Government Documents Department

Louisiana Radiation Control Program Director

bec to DMB (IE35)

bec distrib. by RIV:

  • RPB DRSP
  • Resident Inspector R. D. Martin, RA
  • Section Chief (RPB/A) *D. Weiss, RM/ALF
  • MIS System *RSB
  • RSTS Operator * Project Inspector
  • R&SPB *R. Hall
  • RIV File *N. M. Terc
  • L. A. Yandell *W. L. Fisher

R. L. Bangart D. B. Matthews, IE

FEMA RVI G. F. Sanborn

  • w/766