Informs of Rescheduled Fuel Load Date from 870430 to 870521 Due to Replacement of Three MSIVs Mfg by Atwood Morrill W/ Air to Open,Spring to Close Valves.Testing & Installation Should Be Complete by 870630
ML20205B607
Person / Time
Site: Beaver Valley
Issue date: 03/23/1987
From: Carey J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
2NRC-7-053, 2NRC-7-53, NUDOCS 8703300013
Download: ML20205B607 (2)


Text

,

}Vg

'A@

M 2NRC-7-053 Bewer Valle o 2 Unit Project Organization Telecopy 643-Ext. #60 P.O. Box 328 March 23, 1987 Shippingport, PA 15077 United States Nuclear Regulatory Conrnission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Revised Fuel Load Date Gentlemen:

It is necessary to revise the scheduled fuel load date from April 30, 1987 to May 21,1987.

We are presently replacing the three Main Steam Isolation Valves (MSIV) which are rotating ball type with "Y"

pattern globe valves manuf actured by Atwood Morrill.

These air to open, spring to close valves should be installed and tested by June 30, 1987.

However, since the reactor plant wil l not be affected by the valve replacement activity, it is our intent to proceed with fuel load starting on the date indicated above.

The BV-2 Unit will be maintained in bbde 5 in order to permit cold check out of the reactor and associated NSSS components prior to the completion of the MSIV replacement.

DUQUESNE LIGliT COMPANY 6K 4,/ Carey C

Senior Tice President REM /ijr NR/ REM / FUEL /LD AR/NAR cc:

Mr. P. Tam, Project Manager Mr. J. BealI, NRC Sr. Resident Inspector Ms. A. Asars, NRC Resident inspector INP0 Records Center g

hhh2 DOC O

9

~ United States Nuclear Regulatory Commission Revised Fuel Load Date Page 2 COMMONWEALTH OF PENNSYLVANIA )

)

SS:

COUNTY OF BEAVER

)

On this j a e day of

/te -// s

,/f/f7, before me, a Notary Public in and for said Commonwealth and County, personally appeared J. J. Carey, who being duly sworn, deposed and said that (I) he is Senior Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge, as 24 e

' Notary Pub lic ELVA G LE50NDAK, NOTAF.Y PU3LIC SH!Pf1NCFORT, CEN/ER COUNTY f.1Y COMMISSION EXFiRES OCTOBER 20,1990