v JOSE 111 M. FARIJN NUCLEAR PLANT LMIT 2 NARRATIVE SltM\\RY OF OPERATIOKS September, 1988
%ere were two sequential significant power n<luctions during the month of Septanber.
On Septtsber 1, pwer uns rexheal to approxiintely 33% reactor pwer to facilitate the relnir of two heater drain tank level control valves arul to replace the air regulator on the 2C fealwnter regulating valvo.
On September 3 reactor puer wus further nyluced to 15% to allow contamirants to return from hideout on the secordary sido of the stetun generators. %in hideout return is intended to raluce degradation of the sterun gereerator tules. %e unit returnal to full power operation on Sept <nler 4.
%e following anJor safety-related unintenance was perfontwxi in the sonth of Septemler:
1.
We 2A containment spray pnp room cooler was cleaned arxl its stay tolta were replaced.
2.
%e 20 component cooling water pinp was overhauled.
3.
We 2C service water pap nnin control leani harxiswitch was replaced.
4.
Re 2A motor driven auxiliary fealwater pnp room cooler was cleanal i
arxl its stay loits were replacal.
5.
%e vent valve una replacal on the 2C charging pnp.
6
%e suction screen una replacal on the 2B rmtwnste supply fan.
i 7.
Miscellaneous cormetive arxl pmventise uninterance kna lerformal on the diesel generators.
i t
t
$k 8810260234 880930 PDR ADOCK 05000364 R
PDC f
l
OPERATING DATA REPORT DOCKET No. 50-364 DA'IE 10/4/88 COMPLCITI) BY D. N. Morey
'1ELEPHONE (205)899-5156 OPERATING S'IA'IUS Notes
- 1. Unit Name:
Joseph M. Farley - Unit 2
- 2. Reporting Period:
Septembe r, 19t'S
- 1) Cumulative dita since
- 3. Licensed hermal Pwer (mt):
2,652 7-30-81, date of
- 4. Nameplate Rating (Gross We):
860 comercial operation
- 5. Design Electrical Rating (Net We):
879
- 6. Maximum Deperriable Capacity (Gross We):
863.8
- 7. Maximum Dependable Capacity (Net We): 7.8
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:_ N/A
- 9. Power Level To Which Restricted, If Any (Net Me):
N/A
- 10. Reasons For Restrictions, If Any:
N/A Wis Month Yr-to-Date Cumallative
- 11. Ilours In Reporting Period 720 6,575 62,880
~
- 12. Itaber Of Hodra Reactor Was Critical 720.0 6,575.0 59,468.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
- 14. Ilours Generator On-Line 720.0 6,575.0 53,823.6
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross h ermal Energy Generated (MWH) 1,767,980 17,249,993 136,593,265
- 17. Gross Electrical Energy Generated (MKil) 574,502 5,679,526
__44,882,742
- 18. Net Electrical Energy Generated ( Wil) 545,034 5,411,062 42,562,800
- 19. Unit Service ractor 100.0 100.0 85.6
- 20. Unit Availability ractor 100.0 100.0 85.6
- 21. Unit capacity ractor (Using MDC Net) 92.0 100.0 82.9
- 22. Unit Capacity ractor (Using DER Net) 91.3 99.3 81.7
- 23. Unit Forced Outage Rate 0.0 O.0 4.8
- 24. Shutdwns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling / Maintenance Outage, March 24, 1989, approximately six weeks
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Comercial Operation):
rotecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELEC'IRICITY D5/24/81 05/25/81 00NO3CIAL OPERATICH V8/01/81
._ 07/30/B1 Form 2/30
DOCKET NO. 50-364 UNIT 2
MM OC'IOSER 3,1988 00MPLE!1D BY_D. N. Morey TELEPHONE (205)899-5156 MON!M Septembei MY AVERAGE MILY PONER LEVEL MY AVERAG" MILY POWER LEVEL (ftte-Net)
(704e-Net) 1 793 17 819 2
189 18 822 3
107 19 823 4
172 20 820 5
830 21 818 6
837 22 827 7
836 23 824 8
840 24 820 9
835 25 820 10 825 26 823 11 821 27 827 12 821 28 829 13 822 29 828 1
14 822 30 826 l
15 818 31 16 817 INSSUCTIONS 1
On this format, list the average daily unit power level in lefe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Form 13/21 1-
m
<l WWIT SWWF90MES Age PoWR BBOUCT1055 SecEET 30.
$4-344
)
W mgE J. R. FAAE2r - W 2 Bart oCToSEE 4, 1944 CSIWEATES WT D. W. MOSEr SEpoWT NOWWW.EFTWWER TE12Peous (20SIe99-S156 i
i I
I I
I =Er=os oF l ue=sEE I
-1 I
caesE coesserr,E I
I I
I I samarte. I I sE m I=E 1:T=r i srsten I com e===r I
aceros v.
I S
5 leo.
I omrt I rrrE I smosas) 1-m 2 I na== mEAcros' I mEscer e I coeE' I ca.E i
enEwsWr -
1 I
I I
I I
I I
I I
I I
I oos I essee: I s
I e..
I e
i sfa i
sea i
se 1
En i e - r =..
r.4 t. rep.ir t t = t e 4.i.
I i
i I
I I
I I
I I
I t== 1-1 <=tr.1 al- =4 c. reet.c. tw air I I
I I
I I
I I
I I
I r.,. tat.c es. ac f t.r
.,.1.ti.,. 1.
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I est i
....e3 I
s I
o..
1 I
s/A I
afa i
as I
r l
. c.ai.eea t. all e t
- t. t.
I I
I I
I I
I I
I I
I r.t r. f.
mi e
sm...c rr.iae.f es. 1 I
I I
I I
I I
I I
I== = - rater =.
I I
I I
I I
I I
I I
I i
i i
i i
l I
i l
i i
I I
I i
i i
l i
l I
i l
I i
i i
i i
i l
i i
i i
l I
I I
I I
I I
I I
I I
I i
1 1
I i
1 1
I I
I I
I I
I I
I l
I I
I I
I I
I I
I I
I I
I I
i I
i l
i I
I I
I I
I I
i I
I i
l i
i i
i i
i l
i l
I i
i i
i I
I I
I I
I I
i I
i i
I I
Fs F.re.d m.es.m mothed:
Eahibit G-Eastructices ss Sch.4mled A-Equipenet Failer. (Emplais) 1-nmanal for Properaties.f Data e-maintema%:..c T.st 2-meenal scram.
Entry she.ts f.c Licens c-a. fueling 3-Aut.matic scram.
Eweet asp.rtisaal Fil. (Euses-D-Regulet ry me.trictice 44Rher (Emplela) 8161)
E-operat.r Training & Liceae. Enemin. ties F-Administrettwo Eskibit 1 -same s.ure.
G-operati.e.* Err.r (Esplais)
(9/77) s-other (Earlais)
. M Rum M
OrewrING De RErastT DOCKrr NO.
50-364 Dm 10/4/B8 CDEP!E!1D BY D. N. Morey
'112 2 P H 3 L (205)899-51T6 OrmwrING S1R2US Notes
- 1. Unit Name:
Joseph M. Farley - Unit 2
- 2. Reporting Period:
September, 1988
- 1) Cumulative data since
- 3. Licensed thermal Power (!Wt):
2,652 7-30-81, date of
- 4. Nameplate Rating (Gross MWe):
860 conssercial operation
- 5. Design Electrical Rating (Net me): 829
- 6. Maximus Dependable capacity (Gross )EsT:
863.8
- 7. Maxin a Dependable Capacity (Net Me): 7 72.8
- 8. If Changes occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
- 9. Pcwor I4 vel To Which Restricted, If Any (Net Me):
N/A
- 10. Reasons For Restrictions, If Any N/A 4-
'this Month Yr-to-Date Cumlative ils Hours In Reporting Period 720 6,575 62,880
- 12. Number Of Hours Reactor Was Critical 720.0 6,575.0 59,468.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
- 14. Hours Generator On-Line 720.0 6,575.0 53,823.6
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0'
- 16. Gross Thermal Energy Generated (PWH) 1,767,980 17,249,993 136,852,742 593,265
- 17. Gross ciectrical Energy Generated (!WH) 574,502 5,679,526
_ 4 4,
- 18. Het Electrical Energy Generated (PWH) 545,034 5,411,062 42,562,800
- 19. Unit service Factor 100.0 100.0 85.6
- 20. Unit Avatlability ractor 100.0 '
100.0 85.6
- 21. Unit Capacity Factor (Using MDC Net) 92.0 10 00-82.9
~
- 22. Unit Capacity Factor (Using DG Net) 91.3 99.3 81.7
- 23. Unit Forced Outage Fate 0.0 0.0 4.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling / Maintenance Outage, Malch 24, 1989, approximately six weeks
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A,
- 26. Units In Test Status (Prior to Coaswrcial Operation):
Forecast Adtieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELIC'IRICITY 05/24/31 05/25/31 039ENCIAL OPERATICM D8/Ul/31 07/30/31 rorm 2/30
((g
/
'1 DOCKET NO.
50-164 LMIT 2
DMT OCTOBER 3,1988 COMPLEIED BY D. N. Morey TTLEPHONE (205)899-5156 MCN1H September DAY AVERAGE DAILY POWER LEVEL DAY AVEMGE DAILY POWER LEVEL (790e-Net)
(Pt$e-Net) i 1
793 17 819 2
189 18 822 l
3 107 19 823 4
172 20 820 5
830 21 818 6
837 22 827 7
836 23 824 8
840 24 820 9
835 25 820 10 825 26 823 11 821 27 827 12 821 28 829 13 822 29 828 24 822 30 826 15 818 31 16 817 INS 11tVCTIONS On this format, list the avetage daily unit power level in Pede-Net for each day in the reporting month. Conpute to the nearest whole megawatt.
t i
Form 13/21 l
e UNIT $3UTuotAE* A50 POWER REDUCTIOW4 DOCKET N0.
54 44 -
UNIT BA85 J. M. FARLEY - UNIT 2 DATE OCToeER 4, 1988.
COMPLETED BY D. W. MORET REPotT MoerfE SEPTEMBER TELEFWOWE (205)s99-5156 1
I I
I I
I MEr== or i L1cEnsEE I I
I c a sE a comr.EcTrvE l
1 1
I l==ATro=
l sauTrras l EvErr i srsTEn I coaro=E=r i
AcTrom To I
i mEAso,2 l,,,,,c,,3 1
,c, g c,,,s
,,,,,,,,c,,,,c, leo.
I DaT:
1 TrrE 1
==E-i 1
I I
i i
I I
I I
I I
l 003 l 880902 l 5
l 0.0 l
8 l
4/A l
N/A l
SN l
LC7 l Powa was reduced to repair two beater drain l
l l
l l
l l
l l
l l tank level control valves and to repla.a the air l l
l l
l l
l l
l l
l regulator n the 2C feed:=ater regu'.ating velve.
l l
l l
l 1
I I
I I
i i
I I
i i
l l
I I
I I
l 004 l 880903 l 5
l 0.0 l
5 l
N/A l
W/A l
AS l
TSG l Power was reduced to allow contaminants to-l l
l l
l l
l l
l l
l return fros hideout on the secondary side of the l l
l l
l l
l l
l l
l 1
1 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
l i
I I
I I
I I
I l
1 I
I I
I I
I I
I I
'l i
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
i i
l I
i l
i i
i I
I I
i I
I i
I I
I I
i l
i i
I I
I I
I i
l l
F2 Forced Reason:
Method:
- Exhibit G-Zastructions 5: Scheduled A-Equipment Failure (Emplain) 1-Manual for 2 reparation of Data 3-Maintenance or Test 2-Manual Scree.
Entry Sheets fos Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory aestrictier, 4-other (Explain) 0161)
E-operator Training & License E2 amination F-Administrative IExhibit I -Same Source G-operatiemal Error (Explain)
(9/77) s:-other (Explain) n axm v2
- &.+. p
[W
[ -I Alabama Power Company e<
600 North 18th Street ^
Post office Box 2641 Birraingham. Alabema 35291-0400 Telephone 205 250-1837 W. G. Heirston, lll Vice President Nuclear Generation -
the Souttwn electre System October 12, 1988 Docket No. 50-364
. U. S. Nuclear Regulatory Comnission ATIN: Document Control Desk Washington, D. C.
20555 Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the Sep.tember 1988 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unic 2, required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Yours very truly, y].).,k=
W. G. Hairston, III WGH/JGSimab/1.6 Attachments xc Dr. J. N. Grace
\\\\\\
.-