ML20205B133

From kanterella
Jump to navigation Jump to search
Informs That E Murphy Will Represent Commonwealth of Ma at NRC Meeting to Consider Util Request for Permission to Retart Plant
ML20205B133
Person / Time
Site: Pilgrim
Issue date: 10/12/1988
From: Barry C
MASSACHUSETTS, COMMONWEALTH OF
To: Zech L
NRC COMMISSION (OCM)
Shared Package
ML20205B003 List:
References
NUDOCS 8810260190
Download: ML20205B133 (1)


Text

,% 4 eg 6 scam 02534171 P.01

.' L 00UhtiM 2 Se LasaspKauadwa 2

e,_m, y,,a u e Michael S. Dukakis b , h e'AdmeM h ave Chules V. Bany hoJhe, vbMac K$n# 0//$S

, s,meem October 12, 1988 Lando Zech, Chairman U.S.11uclear Regulatory Commission Washington, DC 20555

Dear Chairman tech:

Lt.

Governor Dakakia has asked me to inform you that Govornor Evelyn Murphy will represent the Ccmmonwealth of Massachusetts at Friday's .9.R.C. meoting to conalder the Boston Edison Nuclear station Company'S request power Plant.for At permission to restart the Pl1 grim thia proceeding, Lt. Governor Murphy will restate the Commonwealth's position that Boston Edison's power ascenaion program should not hegin until onergency evacuation plana and procedures have been approved by both state and local governmental units and have been completely and successfully tested. Approved and tested plans save lives. "Progress" in the development of plans does not.

that Covernor Dukakis and I were extremely dismayed to learn the Commission will not allev Jocal elected of ficials, localat. civil defense directors, police chiefs and fire chiefs to speak Friday's proceeding. Your refusal to hear from these officials is an insult to the community leaders who have worked long and hard in an attempt to develop Tdequate plans to protect public health and safety in the event that there is a radiological emergency at pilgrim Station. Governor Dukakia and I feel public strongly that the Commission should hear f rcm these officials. However the Commiccion appears prepared to rely solely on the recommen,dations 02 N.h C. staff who have not been directly involved in the ongoing local and state planning processes and who refuse to acknowledge and coc.mit to remedying, prior to resto.rt, the many critical outstaading emergency preparedt.eas issues which remain. I ask that you reconsider your ref usal to hear f rom these local leaders and notify ne immediatoly no that they can be prepared to addreas the Commission on Friday.

Tha nic you in advance for reconsidering your deci ion.

Al e ely, seto260190 881013 ed V -

Charles V. B rey RE PDC Secretary of Public Stifety CVa/er h N-