ML20205A968

From kanterella
Jump to navigation Jump to search
Physical Security Insp Rept 50-433/85-01 on 850325-0410. Violation Noted:Failure to Submit Changes to Security Plan within 2 Months & to Prepare Response to Theft of Snm. Details Withheld (Ref 10CFR2.790)
ML20205A968
Person / Time
Site: 05000433
Issue date: 04/17/1985
From: Norderhaug L, Schuster M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML19269B439 List:
References
50-433-85-01, 50-433-85-1, NUDOCS 8504260213
Download: ML20205A968 (1)


See also: IR 05000325/2004010

Text

i

-

, .

.

,

U. S. NUCLEAR REGULATORY COMMISSION

,

REGION V

Report No:

50-433/85-01 (IE-V-682)

'

Docket No:

50-433

License No:

R-124

Safeguards Category:

III

Licensee:

The Regents of the University of California

Santa Barbara, California 93106

Facility Name: University of California -- Santa Barbara

Inspection at: Santa Barbara, California

Inspection Conducted:

March 25 -- April 10, 1985

Date of Last Inspection Visit: March 16, 1981

Type of Inspection: Ro.uti;e, Unannounced Physical Security

[//m N 7,/n y

Inspectors:

>/

f-

mm

L. R.' Nefdsrhau)

~ r

D(te Signed

Seni

terial C

yst

~

/v

gbM/7,/1p/

'

Approved by:

s A

f.

-

41.D.$chddtek, Chief, Safegection

D6te Signed

Inspection Summary:

Areas Inspected: Site Orientation, Security Plan and Implementing Procedures;

Security Organization; Records and Reports; Testing and Maintenance; Keys,

Locks and Combinations; Physical Barriers-Protected Areas, Material Access

Areas and Controlled Access Areas; Lighting; Assessment and Surveillance Aids;

Entry / Exit Control-Personnel, Packages /Special Nuclear Material, and Vehicles;

Detection Aids-Protected Areas, Material Access Areas and Controlled Access

Areas; Communications.

The inspection involved 28 hours3.240741e-4 days <br />0.00778 hours <br />4.62963e-5 weeks <br />1.0654e-5 months <br /> by one NRC inspector.

The inspection began

during normal working hours, and a total of two hours were conducted during

off-hour shifts.

Results: The licensee was found to be in compliance in all areas except as

follows: Security Plan and Implementing Procedures (two violations) and

Entry / Exit Control-Packages /Special Nuclear Material (one violation).

3

_-