ML20205A778

From kanterella
Jump to navigation Jump to search
Forwards Rev 22 to AR-301, ESA Annunciator Response, Rev 33 to AR-303, ESC Annunciator Response & Rev 35 to AR-403, PSA H Annunciator Response
ML20205A778
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/16/1999
From:
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20205A784 List:
References
NUDOCS 9903310068
Download: ML20205A778 (1)


Text

i s

Doew Transmittal #: 112670 Date: 3/16/99 To:

NRC (DC DESK)

MAC: N/A Holder #: 1242 Destination:

==

Description:==

Copy Totals Document:

Revision:

!! IC# Comment:

INF CTf. MST AR0301 22 MINOR CHANGE 1

0 0

AR0303 33 MINOR CHANGE 1

0 0

Ar10403 35 MINOR CHANGE 1

0 0

I Instructions to the Addressee: Please verify the document (s) received agrees with the above information. Notify Document Control if changes are required to addressee information, or mark the transmittal and return as indicated below.

Engineering managers are required by NEP-121 to determine if new, rewad, or temporary changes to procedures affect job functions of their personnel. Managers will commun:cate change information appropriately and provide documentation of any training conducted to the Engineering Training Coordinator.

1 Operations departmerd must attach old document (s) o portions of document (s) superseded by the ates to this transmittal.

The signature Indicates acknovedgment of receipt of the above document (s) and that documentr. have been updated. Return signed and I

dated transmittal to Document Control within 15 working days of transmittal date to mai code:

l SA2A O

j Florida Power Corporation l} {

oorument Control. SA2A i[

Crystal River Energy Comphs 18760 W. Power Line St.

Crystal River, FL 344284708 Signature of Addressee:

Date:

9903310068 990316

~

PDR ADOC L. b ;

K 05000302 PDR;j

]

u