ML20205A728
| ML20205A728 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 09/23/1988 |
| From: | Knop R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Schnell D UNION ELECTRIC CO. |
| Shared Package | |
| ML20205A733 | List: |
| References | |
| NUDOCS 8810260081 | |
| Download: ML20205A728 (2) | |
See also: IR 05000483/1988015
Text
.
--
_
O A
-
O l l A T) W
I fp r A m a l a--
,
-
s ,i u m n . hn
V'i
- - v v s u s .e v
<
.
?
, 204
UNITED STATES
4
NUCLEAR REGULATORY COMMISstON
.
f'
REGION lli
'*
e
e
I
f
,99 moostvtLT moAo
(.....j
c u ~ tuv ~. w~ois ..n,
SEP 2 31989
Docket No. 50-483
Union Electric Company
ATTN: Mr. Donald F. Schnell
Senior Vice President - Nuclear
Post Office Box 149 - Mail Code 400
St. Louis, MO 63166
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. B. H. Little
and C. H. Brown of this office from July 31 through August 31, 1988 of
activities at Callaway Plant, Unit 1, authorized by NRC Operating License
NPF-30, and to the discussion of our findings with Mr. J. D. Blosser and
others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice. A written response
is required.
!
Certain areas examined during this inspection concern a suDject matter which
is exempt from disclosure according to Part 73, Title 10, Code of Federal
l
Regulations.Section73.21(c)(2). This information must t'e handled and
protectad in accordance with the provisions of 10 CFR /3 '1.
Consequently,
4
!
the enclosure to this letter, and your response to the violation identified
in the enclosure to this letter will not be place 3 in the NRC Fublic Docurrent
Room. Therefore, your statement of correctivr. action regarding the violation
identified in the enclosure should be submitted as a separate enclosure to
your transmittal letter in the mar.nor prescribed.
!
,
l
in accordance with 10 CFR 2.790 of the Comission's regulations, a copy of
this letter excluding the enclosure, and the inspection repcrt will be olaced
'
in the NRC Public Document Room.
!
f
Enclosure contolns
I
l
SAFEGJARDS INFORMATICH
Upon Separation This
'
Page Is Decontrolled
8s10260091 830923
I
l
ADOCK 050CO,483
f}
- 3
rDC
.....m
.nnn <
nt: nnn a ne nRI
1
l
0
l
GH
W U Ni \\ t> d
' i ' \\/ 8 ' i i " \\
'V
,
<_
o
,
.
.-
na-
nit A 7 w
urnvr
n~^('
,
,
ON
UUn
) sv
is v
tot n
SEP 2 31988
Union Electric Company
j
i
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
'
f
Richard C. Knop, Chief
F Reactor Projects Branch 3
Enclosure:
1.
Inspection Report
No.50-483/88015(ORP)
2.
(Unclassified Safeguards Info.)
cc w/ enclosures:
I and 2
G. L. Randolph, General Manager,
Nuclear Operations
A. P. Neuhalfen, Manager Quality
Assurance
Tom P. Sharkey, Supervising
Engineer, Site Licensing
NRR/DRIS/SGB
NRR/ORIS/ SIB
NRR/DLPQ/PEB
cc w/ enclosures:
1 Only
DCD/9CB(RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Region IV
Resident Inspector, Wolf Creek
K. Orey
Chris R. Rogers, P.E.
Utility Division, Missouri
Public Service Cocnission
CfA, Inc.
Gerald Charnoff, Esq.
Thoiras Baxter, Esq.
R. A. Kucera, Deputy Director,
'
Department of Natural Resources
Ene16ssreContains
SAFECUARDS INFORMATION