_ _ _ _ _ _ _ _ _ _ _ _ _
.N
=M Log # TXX-88745 4
File # 10130
'~ ~
~
IR 85-13 IR 35 09 M# ELECTRIC Ref. # 10CFR2.201 m m.. c.co a October 20, la88 Decu,,vr Wr Presden.
V. S. iiuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.
205S5
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 REVISED DATE OF FULL COMPLIANCE FOR NOTICE OF VIOLATION ITEM B (445/851a-V-01)
REF: TV Electric Letter TXX-88263 from W. G. Counsil to the NRC dated March 1,1988 Gentlemen:
j The referenced letter stated that the final validation of conduit sleeve identification for Unit 1 and Common systems would be completed by October 20, 1988.
The engineering walkdowns have been completed and have l
resulted in the issuance of approximately 155 Design Change Authorizations (OCAs) and initiation of approximately 70 non-conformance reports (NCRs).
Implementation of the OCAs and NCRs will be performed in accordance with our System and Area Completion schedule and is expected to be completed no later l
than May 1, 1989.
Very truly yours,
- h. 6. Cou n s E d W. C. Counsil By:
/
J.6. Marshall Generic Licensing fianager RSB/gj c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (J)
EBAo"RenB"d8lb G