Submits Status Update of Util 851106 Response to 841213 Order Modifying License.Confirms That Rev to Commitments Re Proposed Design Change Inputs,Safety Evaluations & Training Will Be Completed by 861031,per 860723 Telcon
ML20205A305
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 07/30/1986
From: Opeka J, Sears C
CONNECTICUT YANKEE ATOMIC POWER CO.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
A04547, A4547, NUDOCS 8608110344
Download: ML20205A305 (3)


Text

-( . '

CONNECTICUT YANKEE ATOMIC POWER COMPANY B E R L I N, C O N N EC TIC UT P.o Box 270 HARTFORD. CONNECTICUT 06141-0270 TELEPHONE 203-665-5000 July 30,1986 Docket No. 50-213 A04547 Dr. Thomas E. Murley Regional Administrator Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Gentlemen:

Haddam Neck Plant Response to December 13,1984 Order Modifying License - Status Update In our November 6,1986 letter,(1) we outlined various commitments in response to the Connecticut Yankee Proposed Design Change Task Group (CYPDCTG)

Final Report.(2) The purpose of this letter is to inform the NRC of the status of our efforts.

To date, we have fulfilled all commitments. Two commitments scheduled for completion in the near future are hereby revised as stated below. The original intent of our improvement plans is not being altered, but minor changes to the November 6,1985 letter have been determined to be appropriate. These changes were discussed with your Staff on July 23,1986 and it was agreed that a revised due date of October 31, 1986 was acceptable to complete the required training discussed below.

1. The response to Attachment 1, Table 6, Recommendation 3 of our November 6, 1985 letter provided commitments to a) stress PDCR requirements, design inputs, safety evaluations, and associated procedures in the NEO Procedure Familiarization Course and b) provide detailed (1) 3. F. Opeka letter to T. E. Murley, dated November 6,1985,

Subject:

Response to December 13,1984 Order Modifying License.

(2) D. E. Vandenburgh letter to T. E. Murley, dated September 6,1985,

Subject:

Connecticut Yankee Proposed Design Change Task Group Final Report.

1

/f

( 'J l

,e 8608110344 860730 #~ p PDR ADOCK 05000213 P PDR JM t D

PDCR training by supervisors in departmental sessions. The former commitment has been completed, however, additional time is required to complete detailed PDCR training for our design engineers. A large number of our NEO procedures have recently been revised in response to the recommendations provided in Tables 6 and 7 of the CYPDCTG Final Report. These recent changes have served to remove procedural deficiencies identified by the CYPDCTG resulting in an improved and better documented design change process. Detailed PDCR training by supervisors in how each department is to perform the specific steps necessary to implement the PDCR and associated procedures will be completed by October 31, 1986.

2. The response to Attachment 2, Recommendation 3 of the Connecticut Yankee PDCR 713 Special Report of our November 6,1985 letter provided a commitment to provide training by supervisors to design engineers with respect to technical specifications. This action will be included in the detailed PDCR training discussed in Item 1 above.

We trust you find this information satisfactory.

Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY i

J. F. Opeka '

Senior Vice President By: C. F. Sears Vice President STATE OF CONNECTICUT )

) ss. Berlin COUNTY OF HARTFORD )

Then personally appeared before me C. F. Sears, who being duly sworn, did state that he is Vice President of Connecticut Yankee Atomic Power Company, Licensee herein, that he is authorized to execute and file the foregoing information in the name and on behalf of the Licensee herein and that the statements contained in said information are true and correct to the best of his knowledge and belief.