ML20205A253

From kanterella
Jump to navigation Jump to search

Forwards Amend 125 to License NPF-1 & Safety Evaluation. Amend Revises Shutdown Rod & Control Rod Insertion Limits by Changing Definition of Fully Withdrawn Rods from 228 Steps to Greater than 225 Steps
ML20205A253
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 03/20/1987
From: Chan T
Office of Nuclear Reactor Regulation
To: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20205A259 List:
References
TAC-63526, NUDOCS 8703270406
Download: ML20205A253 (2)


Text

gg ,

,e j in March 20, 1987

~

' Docket'No. 50-3'44 DISTRIBUTION N <.NRC.PDR ACRS (10)

Local PDR PDf3 Rdg. OPA LFMB

.Mr. David W.;Cockfield T. Novak C. Vogan

, Vice President Nuclear T. Chan OGC .

- Portland General Electric Company L. Harmon- E. Jordan 121 S.W.' Salmon Street B. Grimes J. Partlow '

Portland, Oregon 97204 T. Barnhart (4) W. Jones' E.-Butcher N. Thompson

Dear Mr.:

Cockfield:

The Commission has issu'ed the enclosed Amendment No.125 to Facility Operating

-License No. NPF-1 for the Trojan Nuclear Plant. The amendment. consists of changes to the Technical Specifications in response to your application (LCA 146) dated October 31, 1986, as supplemented December 8, 1986, s The' amendment revises Technical Specifications Sections 3.1.3.4 and 3.1.3.5 regarding Shutdown Rod and Control Rod Insertion Limits, by changing the definition of " fully withdrawn rods" from 228 steps to greater than 225 steps.

A copy of the related Safety Evaluation is also enclosed. The notice of issuance will be included in the Commission's next regular bi-weekly Federal Register notice.

Sincerely, Terence L. Chan, Project Manager PWR Project Directorate No. 3 Division of PWR Licensing-A, NRR

Enclosures:

1. Amendment No.125to NPF-l'
2. Safety Evaluation cc w/ enclosures: }6tM See next page j

- PD#3 CVogand PD#3 [O TCha *'

OG dh[f

/)[t/M9 y a

2/ts/87 2/jj/87 2/x/87 $ 7 IFJ"lEAE5E!W P

e

= .. .

  • 1rojan Senior Resident Inspector U.S. Nuclear Regulatory Commission Trojan Nuclear Plant Post Office Box 0 Rainier, Oregon 97048 Robert M. Hunt, Chairman Board of County Commissioners Columbia County St. Helens, Oregon 97501 William T. Dixon Oregon Department of Energy Labor and Industries Building Room 111 Salem, Oregon 97310 Regional Administrator USNRC, Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596

.