ML20205A177
| ML20205A177 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 10/13/1988 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| Shared Package | |
| ML20205A183 | List: |
| References | |
| NUDOCS 8810250415 | |
| Download: ML20205A177 (2) | |
See also: IR 05000321/1988029
Text
I
/
'
'
.
,
,
L L LW
}'
"
.
\\
<
'
>
OCT 1 3 1988
Docket Nos. 50-321, 50-366
License Nos. OPR-57, NPF-5
Georgia Power Company
A TN: Mr. A. G. Hairston, 111
Senior Vice President -
Nuclear Operations
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-321/88-29 AND 50-366/88-29
This refers to the Nuclear Regulatory Coninission (NRC) inspection conducted by
J. E. Menning on August 20-September 23, 1988.
The inspection included a
review of activities authorized for your Hatch facility. At the conclusion of
the inspectiori, the findings were discussed with those members of your staff
identified in the enclosed Inspection Report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in prog ess.
'
The inspection finitings indicate that certain activities appeared to violate
NRC requirements.
However, because all of the criteria for categorization cf
licensee-identified violations were met, the vi,lation is not being cited. The
details pertaining to the licensee-identified volation are described in the
enclosed Inspection Report.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
1
Title 10, Code of Federal Regulations, a copy of thi:; letter and its enclosure
will be placed in the NPC Public Document Room.
The responses directed by this letter and its enclosure are not subject 1.0 the
clearance procedures of the Of fice of Management and Budget as required by the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Should you have any questions concerning this letter, please contact us.
Since ely
h025041500:o23
ADock 05000321
Vir il L. Brownlee, Chief
0
PNU
Reactor Projects Branch 3
Division of Reactor Projects
'
Enclosure:
NRC Inspection Report
cc w/ encl:
(See page 2)
l g
.
IP/
.
.
,
.
!
Georgia Power Company
2
007 4o twg
l
l
cc w/ encl:
(K. P. Mcdonald, Executive Vice President,
Nuclear Operations
V' T. Beckham, Vice President, Plant Hatch
t /. C. Nix, General Manager, Plant Hatch
I
tf (M. Fraser, Site Quality Assurance
Manager
V T. Gucwa, Manager Licensing
and Engineering, Plant Hatch
@f B. Tipps, Manager of Nuclear
Safety and Compliance
State of Georgia
bp w/ encl:
L . P. Crocker, NRR
t
M. V. Sinkule. Rl!
LNRC Resident Inspector
DRS, Technical Assistant
Document Control Desk
l
l
T
Ob
l
LTrocine:ac
M'rSinkule
10/// /88
10/ 188
l
l