Forwards Insp Rept 50-424/85-64 on 851215-17.No Violation or Deviation Noted.Understands That S&W Will Review Two Design Calculations for Structural Steel Inside Containment
ML20204J431
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 07/25/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20204J436 List:
References
NUDOCS 8608110090
Download: ML20204J431 (3)


See also: IR 05000424/1985064

Text

,

-

l

,

.

'

=

JUL 2 51986

Docket Nos. 50-424, 50-425

License Nos. CPPR-108, CPPR-109

.

Georgia fower Company

ATTN:Ar. J. H. Miller, Jr.

President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-424/85-64

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

R. W. Parkhill on December 15-17, 1985 of activities authorized for your Vogtle

facility.

The inspection included a review

of Readiness Review Module 8,

.

Chapter 7.0, " Independent Design Review." At the conclusion of the inspection,

the findings were discussed with those members of your staff identified in the

enclosed inspection report.

The objective of the inspection was to ensure that Stone and Webster Engineering

Co'rporation (SWEC), the Independent Design Review (IDR) contractor, had performed

a thorough review of the subject Readiness Review module chapter, as well as to

ensure that the appropriate corrective action had been implemented by GPC where

necessary.

The results of this inspection are documented in the attached

inspection report and have been discussed with your staff during our inspection

exit briefing.

Based on this inspection we have ' the following general comment regarding

Readiness Review Module 8 - Chapter 7.0.

The scope of the review for Module 8

Chapter 7.0 was very broad and the review produced relevant findings.

However,

the broadness of review scope in combination with the time constraints imposed,

appears to have resulted in some design aspects associated with specific

calculations not being reviewed.

To provide the NRC the assurance that an

adequate depth of review was performed by SWEC and consequently assurance that an

acceptable structural steel design process is in place for the Vogtle project, we

understand that SWEC will review two design calculations for structural steel

inside containment.

This review will include a verification of design inputs, a

detailed review of the actual design calculation, and comparison of the design

with the design drawings.

The specific calculations agreed on for review are

identified in the text of the inspection report.

The aforementioned general comment and the specific comments listed in the

inspection report will be examined during our next inspection of your Readiness

Review program.

Within the scope of the inspection, no violations or deviations were identified.

8608110090 860725

DR

ADOCK 0500

4

' f

scd

,

G'Gorgia Power Company

2

JUL 2 51985

.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in NRC Public Document Room.

1

Should you have any questions concerning this letter, please contact us.

Sincerely,

1 4sLA'

&

V

0

irgiy L.< Brownlee, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Enclosure:

NRC Inspection Report

Acc w/ encl:

d!~P. O'Reilly, Senior Vice President

Nuclear Operations

LR -E. Conway, Senior Vice President &

Project Director

!

D<-0. Foster, Vice President, Project

Support

Pg s'D. Rice, Vice President, Project

Engineering

bl H. Pinson, Vice President, Project

Construction

cl. T. Beckham, Vice President &

General Manager - Operations

!

[R -A. Thomas, Vice President,

{

Licensing

p,, Quality Assurances. Read, General Manager,

.

I

[E -W. Hayes, Vogtle Quality

Assurance Manager

di,C. Ramsey, Manager -

l

Readiness Review

l

68 Bockhold, General Manager,

Nuclear Operations

. Gucwa, Manager, Nuclear Safety

and Licensing

gjConstructionManager

i

H. Googe, Project

/E,-D. Groover, Quality

Assurance Site Manager -

Construction

(cc w/ encl cont'd - see page 3)

l

l

l

\\

5:orgiaPowerCompany

3

JUL 2 51986

.

(cc w/ enc 1 cont'd)

4c%. Bailey, Project Licensing

Manager

. r F. Trowbridge, Esq., Shaw,

-

Pittman, Potts and Trowbridge

kW. Churchill,Esq.,Shaw,

Pittman, Potts and Trowbridge

LErl.. Blake, Jr. , Esq. , Shaw,

Pittman, Potts and Trowbridge

L E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

M. Ledbetter, Commissiour,

Dep

b.artment of Human Resources

Badger, Office of Planning

D nd Budget

D. Kirkland, III, Counsel,

Office of the Consumer's Utility

ouncil

D. C. Teper, Georgians Against

,

Nuclear Eneray

PEB. Margulies, Esq. , Chairman,

Atomic Safety and Licensing Board

Panel

M. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

Panel

M Linenberger, Jr. , Administrative Judge

Atomic Safety and Licensing Board

Panel

M Garde, Citizens Clinic, Director

Government Accountability Project

bec w/ enc 1:

& Reis, ELD

U M. Hill, IE

E- V. Imbro, IE

6 , Miller, NRR

E A rach, EDO

!

V Sinkule, RII

'

[(Aj*ristnot,RII

N K Resident Inspector

Document Control Desk

State of Georgia

RII

dh

MSinkule