ML20204J316
| ML20204J316 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 03/31/1985 |
| From: | Alden W, Logue R PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| CON-#285-591 NUDOCS 8504240663 | |
| Download: ML20204J316 (6) | |
Text
dPERATING OATA REFORT w
e DOCKET NO. 50 - 3 52 DATE APRIL 15:19&5 COMPLETED BY PHILADELPHI A ELECTRIC COMPANY W.M. AL DE N ENCINEER-IN-CHARGE NUCLEAR SECTIDN GENERATICN DIVISION-NUCLEAR TELEPHONE (2153 841-5022 OPERATING STATUS
- 1. LNil NAME: LIMERICR UNIT 1 1 NOTEss UNIT 1 15 IN STARTUP TESTING. l t
i 1
- 2. kEPORTING PERIOD:
MAkCHe 1965 i
FACILITY OPERATING LICENSE l
l 8
- 3. LICENSED THERMAL POWERIMhTis 165 i
NPF-2Te ISSUE D 10/26/84, RE-1 I
I
- 4. NAMEPLATE RATING (GROSS MWhi s 1992 i
STRICT 5 POWER LEVELS NOT 10 1
1 4
- 5. DESIGN ELEC1RICAL RATING INE1 MWEls 1055 l
EXCEED SS OF THE RATED POWER. I I
i 4,. MAA1MAM DEPENDABLE CAPACITY (GROSS MwEls 1
ELECTRIC CUTPUT FROM THE UNIT l I
1 T. MAXIMUM DEPENDABLE CAPAC11Y (NET MhEls l
WAS NOT TET ACHIEVED.
I
- 4. IF CHANGES DCCUR IN CAPACllT RATINGS (11 EMS NUMBER 3 THROUGH Tl SINCE LA ST REPORTe GIVE RE ASONS:
- 9. PowfR LEVEL 10 WHICH RE51RICIEDe IF ANY (NET MWEls
- 10. REASONS FOR RESTRICT 10NS, IF ANY:
THis MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 0
0 0
- 12. NUMBER OF HOUR $ REACTOR WAS CRITICAL 19.7 1,042.1 1,079.8
- 13. REAC10R RESERVE 5HU100MN HOURS 0.0 0.0 0.0
- 14. HOUR $ GENERATOR ON-LINE 0.0 0.0 0.0
- 15. UNIT kE5ERVE SHUTDOWN HOUR $
0.0 0.0 0.0
- 16. GROSS 1HERMAL ENERGY GENERATED (MWHI 698 95,668 95,A68
- 17. GR055 ELECTRICAL ENERGY LENERATED (MWHI O
O O
- 18. NET ELECTRICAL ENERGY GENERATED IMhn) 0 0
0 I
- 19. UNIT SERVICE FACTOR 0.0 0.0 0.0
{
2C. UNIT AVAILABILITY FACTOR 0.0 0.0 0.0
- 21. UNIT CAPACITY FACTOR (USING MOC NET) 0.0 0.0 0.0
- 22. UNIT CAPAC11V F ACTOR EUSING DEk NEll 0.0 0.0 0.0
~
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 0.0
- 24. SHUTO0hMS SCHEDULED OVER NEAT & MON 1Hs (TYPE, DATE e AND DURA 110N OF EAChis
- 25. IF SHUTDOWN AT END OF REPORT PERIODe ESTIMATED DATE OF STARTUPs
- 26. UN115 IN TEST STATUS (PRIOR TO COMMERCIAL OPERAT10Nis FORECAST ACHIEVED INITIAL CRITICAL 11Y 12/19/84 12/22/84 INITI AL ELECTRICITY MID APRIL 85*
COMMERCIAL OPERATION 4RD QTR 85
- DEPENDENT ON RiCERVING FULL POWkR LICENSE.
k 8504240663 850331 l
PDR ADOCK 05000352 R
AVERAGE DAILY UNIT POWER LEVEL COCKET No. 50 - 352 UNIT LIMERICK UNIT 1 DATE APRIL 15,1965 COMP ANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH MARCH 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 1
0 17 0
2 0
16 0
3 0
19 0
4 0
20 0
5 0
21 O
r 6
0 22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
1 12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
"~
16 0
m UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 352 UNIT NAME LIMERICK UNIT 1
+
DATE APRIL 15,1985 REPORT MCNTH MARCH, 1985 COMPLETED BY PHILADELPHI A ELECTRIC COMPANY W.M.ALDEN E NGINE ER-IN-C HARGE NUCLEAR SECTION GENERATION DIVISION-NUCLE AR TELEPHONE (215) 841-5022 l
l l
l l METHOD OF l LICENSEE lSYSTEMICOMPONENTl CAUSE AND CORRECTIVE i
I TYPElDURATIONIREASGNISHUT TING DukNI EVENT l CODE l CODE l ACTION TO NO.i DATE I (131 (HCURS)!
(2) ! REACTOR (3) 1 REPORT 4 l (4) 1 (5) l PREVENT RECURRENCE I
l l
l l
l l
l l M ANUAL SCRAM TO PERFORM MAINTENANCE DURING 1
l l
l l
l l
l l SCHEDULED OUTAGE.
1 I
i i
i I
i i
i i
i 1 -
1 I
I I
I I
(1)
(2)
(3)
(4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA 8 - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EX PL AIN )
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMIN ATION F - ADMINISTRATIVE (5)
G - OPER ATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE I
i I
i k
Docket No. 50-352 Attachment to Monthly Operating Report for March, 1985 Limerick Generating Station Unit 1 March 1 through March 31, 1985 I.
Narrative Summary of Operating Experiences The unit began the month in the hot shutdown condition.
The reactor was then cooled and placed in cold shutdown to start a four week modification outage during which reactor temperature was controlled at 160 degrees Fahrenheit using pump heat via the shutdown cooling system.
During the outage, approximately 82 plant modifications were made to complete construction and correct deficiencies identified during low power testing.
Following
[
modification work on various reactor level instrumentation, backfilling operations associated with the reactor level sensing piping resulted in two inadvertent initiations of the low pressure coolant injection system on March 26 and March 30.
The larger of the two injections resulted in the transport of approximately 8,000 gallons of water from the suppression pool to the reactor vessel.
Reactor chemistry was not'significantly effected by these injections.
These events were reported as Licensee Event Reports.
k-Unit 1 was restarted on April 1,1985 to perform post modification testing on the high pressure coolant injection system and reactor core isolation cooling system.
A main turbine checkout within the limits of the 5% power license is expected in mid-April.
II.
Challenges to Relief Valves During the month, there were no challenges to the main f
steam system safety-relief valves.
l
/SLZ
i PHILADELPHIA ELECTRIC COMPANY 23O1 MARKET STREET P.O. BOX 8699 PHILADELPHIA, PA.19101 (215)8414000 April 15, 1985 i
Docket No. 50-352 Director Office of Resource Management US Nuclear Regulatory Commission Washington, DC 20555 i
f-
SUBJECT:
Limerick Generating Station
(
Ponthly Operating Report Gentlemen:
Enclosed is the monthly operating report for Limerick Unit 1 for the month of March, 1985 forwarded pursuant to Technical Specification 6.9.1.6.
Very truly yours, A
u --i f R.
H.
Logue Superintendent Nuclear Services Attachment cc:
Director, Office of Inspection & Enforcement, USNRC (12 copies)
Dr. T. E. Murley, NRC Mr. Stan P. Mangi, PA Dept. of Envir. Resources Mr. P. A.
Ross, NRC (2 copies)
INPO Records Center See Attached Service List 4
\\
T', I i
L
s cc:
Judge Helen F. Hoyt Judge Jerry Harbour Judge Richard F. Cole Troy B. Conner, Jr., Esq.
Ann P.
Hodgdon, Esq.
f:r. Frank R.
Romano Mr. Robert L. Anthony 1:s. Phyllis Zitner Charles b. Elliott, Esq.
Zori G. Ferkin, Esq.
?:r. Thomas Gerusky Director, Penna. Emergency P:anagement Agency Angus Love, Esq.
David Uersan, Esq.
Robert J. Sugarman, Esq.
I: artha W. Bush, Esq.
Spence U.
Perry, Esq.
Jay 1:. Gutierrez, Esq.
Atomic Safety & Licensing Appeal Loard Atomic Safety & Licensing Board Panel Docket & Service Section (3 Copies)
James Uiggins Timothy R.
S. Campbell
~
pr-u-
k f
January 16, 1985
.m
-