Forwards Safety Insp Rept 50-289/88-17 on 880808-19 & Notice of Violation
ML20204H995
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/17/1988
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hukill H
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20204H998 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 8810240514
Download: ML20204H995 (2)


See also: IR 05000289/1988017

Text

, d.

.~

o

.

.

007 3 7 ggg

Docket No. 50-289

GPU Nuc1 ar Corporation

ATTH:

Mr. H. D. Hukill

Vice President and Director of TMI-1

P. O. Box 480

Middletown, Pennsylvania 17057

Gentlemen:

Subject:

Inspection No. 50-289/88-17

This letter refers to the special safety team inspection conducted i.y Mr. G.

Napuda of this office on August 8-19, 1938 at the Three Mile Island Nuclear

Generating Station, Middletown, Pennsylvania of activities authorized by NRC

License No. DPR-50. Mr. Napuda discussed the results of the inspection with

you and other members of your staff at the conclusion of the inspection and

during an October 4,1988 telephone conversation with Mr. T. G. Broughton of

your staff.

Areas examined during this inspection are described in the NRC Region !

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selected examinations of procedures and represer.tative

records, interviews with personnel, and observations by the inspectors. The

team concluded that the overall outage activities were conducted in a

technically competent fashion except as hereafter noted.

Based on the results of this inspection and 9ur discussion on August 24, 1988

at the NRC Region I office, it appears that certain activities were not

conducted in full complience with NRC requirements, as set forth in the Notice

of Violation, enclosed herewith as Appendix A.

Two violations were identified

relating to (1) inadequate procedures and (2) failure to review a procedure

change within the Technical Specifications allotted time period and the

establishment of a procedure that pertatts this practice.

These violations have

been categorized by severity level in accordance with the "General Statement

of Policy for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (Enforcement

Policy). You are required to respond to this letter and in preparing your

'

response, you should follow the instructions in Appendix A.

The response directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

OFFICIAL RECORD COPY

IR TM1 88-17 - 0001.0.0

'

0/17/88

8s10:40514 881017

gDR

]f c /

lg

ADOCK 0500

- - - - --

rr x . -

..

..

'

(;]C.^=l

'

..

--

-

,1

_ . , . , .

Sq)"

g;W 7 .f 1

1

L ..i

/ GDU Wuclear Corporation

2

-

.

4

i.,.

'Your cooperation with us in this matter is appreciated,

a

Sincarely,

Ud inal Si ned By:

8

C

.

N M.GALLO

"

'

Robert M. Gallo, Chief

Operations Branch

Division of Reactor Safety

1

Enc *osures:

1.

Appendix A, Notice of Violation

2.

NRC Region I Inspection Report No. 50-289/88-17

cc w/ enc 1:

T. G. Broughton, Operations and Maintenance Director, TMI-1

C. W. Smyth, Manager, THI-l Licen

.g

R. J. McGoey,- Manager, PWR Licensing

E. L. Bir' 1. Jr. , Esquire

.THI-Alen (TMIA)

Susquehanna Valley Alliance (SVA)

Public Document Room (POR)

local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ enc 1:

Region I Docket Ruom (with concurrences)

Management Assistant, ORMA (w/o enc 1)

ORP'Section Chief

<

R. Hernan, PM, NRR

7

K. Abraham, PA0

.

Robert J. Bores, ORSS

I

4

l

.

RI:0RS

R :0RS

RT: RS

J apuda

Blumberg

Gallo

f 10/l} /88

10/)f/88

10/ /88

i

OFFICIAL RECORD COPY

1R TM1 88-17 - 0001.1.0

i

10/11/88

'

!

l ..

!

. . .

. _ . , _ - - _- _ _ _ . , . , _ - _ _

. .-

-