Forwards Revised Security Plan,Establishing New Position in Plant Security,Providing Responses to NRC & Clarifying Portions of 860731 Rev 16 to Security Plan.Rev Withheld (Ref 10CFR73.21)
ML20204H607
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 07/29/1986
From: Andrews R
OMAHA PUBLIC POWER DISTRICT
To: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
LIC-86-360, NUDOCS 8608080162
Download: ML20204H607 (2)


Text

,

SliFWJARDS MFORmm0U

'A ENCLOSURE CONTAINS ggg g

SAFEGUARDS INFORMATION.

Omaha Public Power District UPON SEPARATION THIS 1623 Hamey Omaha Nebraska 68102 2247 j

402/536-4000 PAGE IS DECONTROLLED July 29, 1986 y

LIC-86-360 REVIEWED BY:

Mr. Robert D. Martin A

Regional Administrator J. K. Gasper

(//

M U.S. fluclear Regulatory Commission (NAME) f (SIGN /TURE)

Region IV.

611 Ryan' Plaza Drive, Suite 1000 Magtger-Administrative Servicts 7/29/85 Arlington, Tx. 76011 m liva N E)

References:

1.

Docket tio. 50-285 2.

Letter OPPD (R. L. Andrews) to NRC (R. D. Martin) dated July 31, 1986 (LIC-85-353) 3.

Letter f1RC (J. E. Gagliardo) to OPPD (R. L. Andrews) dated May 23, 1986

Dear Mr. Martin:

Transmittal of Fort Calhoun Station Security Plan Revision The purpose of this letter is to submit changes to the Fort Calhoun Station Site Security Plan in accordance to 10 CFR 50.54(p).

Specifically, this letter serves two purposes.

The first is to establish a new position within the Fort Calhoun security force.

The second is to provide a response to Reference 3, which contained descriptions of portions of the Reference 2 Security Plan Revi-sion 16, that were either unacceptable to the f1RC or required clarification.

The new position to be added to the Fort Calhoun Security Force is that of the fluclear Watch Officer. includes the site security plan change that establishes this position.

Included in tnis Enclosure is an explanation and justification of the tasks to be performed by this officer. contains OPPD's response to the comments provided by the f1RC in En-closure 1 of Reference 3.

The enclosure contained comments regarding changes (to the site security plan) that were considered by the NRC to be unacceptable.

In Enclosure 2, a response is provided to each comment. contains OPPD's response to the comments provided by the f1RC in En-closure 2 of Reference 3.

The enclosure contained comments regarding changes (to the site security plan) that required clarification.

In Enclosure 3 a re-sponse is provided to each comment.

VIARNING UNAUTHORI?ED DISCl OSURE IS FROHIBITED, SECTION 147 ATOWC ENERGY ACT 1954 AND 10 CFR 73.21. VIOLATIONS SUBJECT TO civil AND CRIMINAL SANCTIONS

\\

0

  • * [ [ [TO'N',,-,

8608080162 860729 Q

pDR ADOCK 05000085 PDR t tI g,

pponunny 4s wa

~

$MGtBDS [lEW,AllM

. R. D. Martin LIC-86-360 Page 2 o consists of the actual revised pages of the Fort Calhoun Station Site Security Plan that represent Revision 19 (with the exception of those pages appearing in Enclosure 1).

It should be noted that OPPD has met with Region IV staff members to discuss specifics of this plan change prior to our submittal.

These changes are being submitted pursuant to 10 CFR 50.54(p).

These changes should be incorporated into your copy #6 of the Fort Calhoun Station Site Security Plan.

If you have any questions, please do not hesitate to call.

Sincerely, R. L. Andrews Division Manager Nuclear Produc[jon RLA/JRG/me Enclosures cc: w/o Enclosures LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Ave., N.W.