In Reply Refer To:
Dockets:
50-445/86-11
JUL g}, M6
50-446/86-09
Texas Utilities Generating Company
ATTN: Mr. W. G. Counsil,
Executive Vice President
400 North Olive, L.B. 81
Dallas, Texas 75201
Gentlemen:
This refers to the inspection conducted by Messrs. W. P. Haass, A. Vietti-Cook,
C. Early, and G. L. Madsen during the period May 5-8, 1986, regarding the TUEC
programs established to identify and investigate safety concerns of workers at
the Comanche Peak plant site, and to the discussion of our findings with
Mr. W. G. Counsil, and other members of your staff on May 8,1986.
Areas examined during the inspection in'cluded the applicant's policies,
procedures, and implementation of the Comanche Peak site Ombudsman and SAFETEAM
programs. These programs were set up to receive, evaluate, and resolve concerns
arising during plant design and construction which might not otherwise come to
the attention of TUEC or to the attention of the NRC.
Because these programs
fulfill an important function, we decided to evaluate their effectiveness even
though these programs are not specifically required by NRC regulations. The
inspecticn consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspectors. The
inspection findings are documented in the enclosed inspection report.
During the August 26-29, 1985 NRC inspection, some areas for improvement to the
SAFETEAM program were identified. As a result, TUEC evaluated each item and by
letter dated May 14, 1986, from W. G. Counsil to Eric H. Johnson, a formal
response was provided.
Within the scope of this inspection, no violations or deviations were identified.
Should you have any questions concerning this inspecticn, we will be pleased to
discuss them with you.
Sincerely,
g 3,9 staned GV
p p, e nsnn
E. H. Johnson, Director
Division of Reactor Safety and
Projects
Enclosure:
(see next page)
IV:RI
C: CPG S
C:RSB I
D:DRSP W
/ D'O [
f(
GMadsen:sj
IBarnes
TWesterman
EHJohnson
$ /3d/86
7 / /86
7// /86
g/g/86
/
4
8608080157 860731
\\
ADOCK 0500
S
G
, - -
-
. . .
Texas Utilities ~ Generating Company
-2-
Enclosure:
Appendix - NRC Inspection Report
50-445/86-11
50-446/86-09
cc w/ enclosure:
Texas Utilities Electric. Company
' ATTN:
G. S. Keeley,. Manager
. Licensing
.
,
-
Skyway Tower
400 North' Olive Street =
Lock Box 81
~
-
Dallas' Texas 75201
,
.
.
-
.
~ Juanita Ellis
^
.
-
President --CASE'
'N
4
1426 South' Polk Street
s
'
Dallas, Texas 75224
'
~ Renea Hicks
' Assistant: Attorney Ge'neral
Environmental Protection Division
P. O. Box 12548
,
!
Texas Radiation. Control Program Director
bcc.to DMB (IE01)
!
bcc distrib. by RIV:
- RPB
- MIS System
- RRI-0PS
- RSTS Operator
i'
- RRI-CONST'
- R&SPB
- T. F. Westerman, CPTG
DRSP
l
V. Noonan, NRR
R. Martin, RA
S. Treby, ELD-
- RSB
'
- RIV File
J. Taylor, IE
- D. Weiss, LFMB (AR-2015)
R. Heishman, IE
G. Madsen
I. Barnes
1
- w/766
t-
!
4
l
(
!-
i
l
.
, . - , _ . - - - . - . . - , . . , , _ _ . - - - - . _ , - . _ _ ,
-
-- --.-..,_.-. -,_,..--,_ _ ,-.,_,.-.
. - - - - - , - - . . . . . . - . - - ~ .