ML20204H334

From kanterella
Jump to navigation Jump to search
Ack Receipt of 840806 Response to 840710 Notice of Violation & Proposed Imposition of Civil Penalty.No Mitigation Warranted for Proposed Civil Penalty,Per Encl Order.Order Withheld (Ref 10CFR2.790)
ML20204H334
Person / Time
Site: Hatch, San Onofre  Southern Nuclear icon.png
Issue date: 11/01/1984
From: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Kelly R
GEORGIA POWER CO.
References
EA-84-059, EA-84-59, NUDOCS 8411120262
Download: ML20204H334 (2)


Text

._

des f% 9[o,, UNITED STATES

  • ! o NUCLEAR REGULATORY COMMISSION h $ WASHINGTON, D. C. 20555

+.***

/ NOV 01.1984 Georgia Power Company ATTN: .Mr. R. J. Kelly Executive Vice President P.O. Box 4545 Atl anta , ' GA 30302 Gentlemen:

SUBJECT:

ORDER IMPOSING CIVIL PENALTY: EA 84-59 (REFERENCE REPORT NOS. 50-321,366/84-18)

This refers to your letter of August 6, 1984 in response to the Notice of Violation and Proposed Imposition of Civil Penalty, EA 84-59, sent to you with our letter of July 10, 1984. The violation, which was brought to NRC attention by your staff on May 22, 1984, resulted in an NRC special safeguards inspection of activities authorized by NRC License Nos. DPR-57 and NPF-5 on May 30,1984 at the Edwin I. Hatch Nuclear Plant, Units I and 2.

After giving careful consideration to your response, we have concluded for the reasons given in the enclosed Order that no mitigation is warranted for the proposed civil penalty. As previously described in our July 10, 1984 letter, the civil penalty imposed by this Order is intended to emphasize the need for Georgia Power to ensure that security personnel adhere to established procedural requirements.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards information is exempt from public disclosure. Therefore, the Appendix to the enclosed Order will not be placed in NRC's Public Document Room.

The responses directed by this letter and the enclosed Notice are not subject to the clearance procedures of the Office of Management and Budget, issued under the Paperwork Reduction Act of 1980, PL 96-511.

Sincerely, i '

, /-

< f a s M. Taylo Deputy Director 0 ice of Inspection and Enforcement

Enclosure:

(See next page)

CERTIFIED MAIL RETO W kECEIPT REQUESTED McLOSURE CONTAINS SAFEGUARDS INFOPEATI6E.

UPON SEPARATION, THIS 8411120262 841foi PAAE IS DECOETROLLED. $DRADOCK05000

- .- o

.y .

NOV 011984 Georgia Power Company

Enclosure:

Order Imposing Civil Monetary Penalty with Appendix -

' Evaluations and Conclusions cc w/ encl:

J. T. Beckham, Vice President and General-Manager H. C. Nix, Site General Manager P. E. Fornel,' Site QA Supervisor Distribution-(w/oenclosure)

PDR

.NSIC LPDR ACRS SECY CA JTaylor, IE JAAxelrad,-IE PRobinson, IE*

JLieberman, ELD JP0'Reilly, RII*

VStello,DED/ROGR FIngram, PA Enforcement Coordinators RI, RII, RIII, RIV, RV Sconnelly, 0IA

-BHayes, 01-HDenton, NRR RStark, NRR Project Manager, NRR f JCrooks, AE0D

-EJordan, IE.

NGrace, IE RBurnett, NMSS Resident Inspector-Regional Distribution State Public Utility Commission State Attorney General IE:ES-File-IE:EA File E00 Rdg File DCS

  • with enclosure RII Mk MPuckett" RII ATiliman RII DMcGuire RII JP0'Reilly 10/u/84 10/ /84 10 /84 be [ alr BCLOSURE 00FfAllf$

/84 10/ 1/84 8.iFEGUARDS INFORMATIS.

10/////84 10/y/84 UPON SEPARATION, THIS PAGE IS DECONTROLLKL

-