ML20204H317
| ML20204H317 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 11/06/1984 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20204H321 | List: |
| References | |
| NUDOCS 8411120255 | |
| Download: ML20204H317 (2) | |
See also: IR 05000456/1984012
Text
.
~
bfnb
4
,.
,
-
,
h
O IM
,
- Docket-No. 50-456
- Docket' No. : 50-457
Commonwealth Edison. Company
- ATTN: : Mr. J Cordell - Reed -
'
?Vice President
Post Office Box 767
'
.
<
_ Chicago,'IL ~60690.
~
Gentlemen:
'
Enclosed for your review, prior to~our scheduled meeting of November 26, 1984,
is the SALP.4 Board Report for the Braidwood Nuclear Station Units 1 and 2,
covering the period January.1,1983 through June 30, 1984.
.
-
1Your; regulatory performance at the Braidwood Station was considered to be
' ' '
1 acceptable during this: assessment period.
The rating d_eclined from.a Category
4
,
1 to a Category 2 in one: area (Licensing Activities) and from a Category 2 to
Da Category 3.in one' area (Piping Systems and. Supports). The rating remained
at:a Category 2 in three areas (Containment and Other Safety-Related Structures, .
iSupport Systems, and Electrical. Power Supply and Distribution) and at a Category
H3 in twoEfunctional areas ~(Safety-Related Components, and Quality Assurance and
? Administrative.' Controls). Additionally, three areas that were not rated during
the previous SALP, are now rated at a Category 2 (Instrumentation and Control
- Systems, Construction and.Preoperational Testing, and Health Physics).
During the fir'st part of the SALP period, your performance with regard to
~
< identifying and implementing corrective' actions to resolve known problems
and nonconforming conditions was of significant concern to us.
However, during
the last part of.the SALP period, your performance improved. considerably and in
most cases.your corrective: actions have been responsive and adequate. Overall, your
,
,
- regulatory performance within the SALP period'showed an improving trend.
,
'
We recognize that. CECO management has become more concerned with the construction
7*
'problemslidentified at Braidwood. The management personnel changes that have-
D
2been made are. viewed positively by the NRC. We also consider the Braidwood
~
,
L'-
-Construction Assessment Program (BCAP),.developeo-during the latter part of the
SALP.-pericd,- to be a positive action. We are continuing to follow this program
- ;E'
closely!toidetermine its effectiveness.
r:
L
'While'you:will have sufficient opportunity-to present your comments at the
U
? meeting on November 26,,1984, you may also provide written comments within
30 days after.the meeting. We wi11' evaluate your comments and provide you with
'
- our conclusions relative to them.
o
i
,
'3411120255'841106
,-
'
<
PDR ADOCK 05000456
g
G_
__
40
-
'
u \\
.
C:
.f
g
.
NOV 0 61984
Commonwealth Edison Company
2
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
- Title 10, Code of Federal Regulations, a copy of-this letter and the SALP
Report will be placed in the NRC's Public Document Room.
No' reply to this letter is required at this time; however, should you have
any questions concerning the SALP report, we would be pleased to discuss them
with you.
95
'kignedbp
A* Bert Dhvis
James G. Keppler
Regional Administrator
~ Enclosure: -SALP 4 Board Report-
No. 50-456/84-12;
-No. 50-457/84-12
cc w/ enc 1:
D.;L. Farrar, Director
of Nuclear Licensing
M. Wallace, Project Manager
D.'Shamblin, Construction
Superintendent
J. F. Gudac, Station
Superintendent
C. W. Schroeder,. Licensing and
Compliance Superintendent
-DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
.Phyllis Dunton, Attorney
General's Office, Environmental
E
Control Division
D.;W.1Cassel, Jr., Esq.
R. C. DeYoung, IE
-H. R. Denton, NRR
Regional Administrators
RI, RII, RIV,.RV
RI
RII
RI
RIII
RIIIA
RI I
RIII RIII.
RIIT
Daishe.1
g-
gg)
>\\f
&
i
dcGregor/b1Mc Liz
orney Warnick N
(fius Spdsard
ppler
n
-10/30/84- .T
ech q
10/SD
}[
icl3o p
I/ P //%