ML20204G381

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-498/88-52 & 50-499/88-52 on 880808- 0902.No Violations or Deviations Noted.Two Unresolved Items in Paragraphs 3.2.2,3.3.1 & 5.5 of Rept
ML20204G381
Person / Time
Site: South Texas  
Issue date: 10/17/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20204G384 List:
References
NUDOCS 8810240103
Download: ML20204G381 (3)


See also: IR 05000498/1988052

Text

.

.

.

,

,

In Reply Refer To:

OCT ! 71988

Dockets:

50-498/88-52

50-499/88-52

Houston Lighting & Power Company

ATTN:

J. H. Goldberg, Group Vice

President, Nuclear

P.O. Box 1700

Houston, Texas 77001

Gentlemen:

'

This refers to the inspection conducted by Pessrs. D. R. Hunter and R. J. Evans

of this office during the period August 8 tnrough September 2,1988, of

activities authorized by NRC Construction Permit CPPR-129 for the South Texas

l

Project, Unit 2, and to the discussion of our findings with J. T. Westermeir

L. d other members of your staff at the conclusion of the inspection.

,

Areas examined during the inspection included Unit 2 emergency operating

procedures, maintenance procedures and Technical Specifications review. Within

these areas, the inspection consisted of selective examination of procedures

and representative records, interviews with personnel, and observations by the

NRC inspectors. The inspection findings are documented in the enclosed

inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

Two unresolved items are identified in paragraphs 3.2.2, 3.3.1, and 5.5 of the

enclosed inspection report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

L. J. Callan Director

Division of Reactor Projects

Enclosures:

Appendix B - NRC Inspection Report

'

50-498/88-52

50-499/80 52

,'

cc w/ enclosures:

(s'fe next page)

f

qkh

RIV:RI

RI 'fh

C:0PS

-

0:DR$'[

0:

t

ORHunter

pJE4ns

JEGagli

do

,JLHjiboan

LJ allan

4

/ /88

( f ela/88

/*/n/,88

n/ , dR8

to /q /88

l

8810240103 881017

(\\

I

PDR

ADOCN 05000490

l

0

PDC

_ _

-

. __

_

. _ .

__.

.

.

.

,

.

'

.

Houston Lighting & Power Company

-2

L

2

i

I

cc w/ enclosures-

Houston Lighting & Power Company

Newman & Holtzinger, P.C.

l

ATTN:

M. A. McBurnett, Manager

ATTN: .J. R. Newman, Esquire

Operations Support Licensing

1615 L Street, N.W.

P.O. Box 289

Washington, D.C.

20036

Wadsworth, Texas 77483

J

s

Houston Lighting & Power Company

Houston Lighting & Power Company

?

l

ATTN: Gerald E. Vaughn, Vice President

ATTN:

S. L. Rosen

l

1

Nuclear Operations

P.O. Box 289

I

P.O. Box 289

Wadsworth, Texas 77483

i

{

Wadsworth, Texas 77483

j

Houston Lighting & Power Company

Houston Lighting & Power Company

!

'

ATTN:

J. T. Westermeier, General Manager

ATTN:

R. W. Chewning, Chairman

!

3

South Texas Project

Nuctear Safety Review Board

i

P.O. Box 289

P.O. Box 289

Wadsworth Texas 77483

Wadsworth, Texas 77483

i

Central Power & Light Cortpany

City Public Service Board

ATTN:

R. L. Range /R. P. Verret

ATTN:

R. J. Costello/M. T. Hardt

r

j

P.O. Box 2121

P.O. Box 1771

(

Corpus Christi. Texas 78403

San Antonio, Texas 78296

i

i

City of Austin Electric Utility

Houston Lighting & Power Corrpany

l

ATTN:

R. J. Miner, Chief Operating

ATTN:

Licensing Representative

'

Officer

Suite 610

721 Barton Springs Road

Three Metro Center

,

j

Austin, Texas 78704

Bethtsda, Maryland 20814

Texas Radiation Control Program Director

!

'

1

i

bec:

(see next page)

i

1

i

i

i

I

!

I

i

!

'

!

'

i

!

i

i

}

i

J

- - -

-

-

-

_

l

t

t

.

,

'

,

,

.

-

.

Houston Lighting & Power Company

-3-

'

I

l

bec to DMB (IE01)

t

1

l

bec distrib. by RIV:

'

I

  • DRP
  • RRI-OPS

,

  • R. D. Martin, RA
  • 0RS

!

  • Section Chief (DRP/D)
  • RPB-DRSS
  • MIS System
  • RIV File

Lisa Shea, RM/ALF

  • RSTS Operator

l

R. Bachmann. OGC

  • D. Hunnicutt
  • G. Dick, NRR Proje:t Manager
  • Project Engineer. DRP/D
  • RR!-CONST
  • J. E. Gagliardo

!

  • D. R. Hunter
  • R.

Evans

!

l

  • w/766

.

!

l

l

!

!

,

i

I

l

l

.

-

- -

-

-

.

\\