Forwards IE Insp Rept 50-305/83-01 on 830103-0302 & Notice of Violation
ML20204G047
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 04/11/1983
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Giesler C
WISCONSIN PUBLIC SERVICE CORP.
Shared Package
ML20204G051 List:
References
NUDOCS 8305020349
Download: ML20204G047 (2)


See also: IR 05000305/1983001

Text

.

.

APR 11 1983

Docket No. 50-305

Wisconsin Public Service

Corporation

ATTN: Mr. C. W. Giesler

Vice President-Nuclear Power

Post Office Box 1200

Green Bay, WI 54305

Gentlemen:

This' refers to the routine safety inspection conducted by Mr. R. L. Nelson

of this office during the period of January 1 - March 2,1983, of activities

at the Kewaunee Nuclear Power Plant authorized by DPR-43 and to the discussion

of our findings with Mr. D. C. Hintz at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in

noncompliance with NRC requirements, as specified in the enclosed Appendix.

A written response is required. With regard to Item 4, your responses

should describe steps you have taken to assure that Type 2 and 3 components

are not installed in Type 1 systems without documentary evidence that the

items conform to Type 1 requirements. Your description should include

information such as the number and identifying number of design changes,

modifications, and maintenance work requests reviewed, results of review,

and any corrective actions resulting from the review.

In accordance with 10 CFR 2.790(a), a copy of this letter and the

enclosure (s) will be placed in the NRC Public Document Room unless you

notify this office, by telephone, within ten days of the date of this

letter and submit written application to withhold information contained

therein within thirty days of the date of this letter. Such application

must be consistent with the requirements of 2.790(b)(1). If we do not

hear from you in this regard within the specified periods noted above, a

copy of this letter, the enclosure (s), and your response to this letter

will be placed in the Public Document Room.

R

fo$000N5

PDR

_-. -

_. ._ - . - . - _ .

Z 80/

.

.

t

.

Wisconsin Public Service 2

Corporation

The responses directed by this letter (and the accompanying Notice) are

not subject to the clearance procedures of the Office of Management and

Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original signed by C. E. Norelius

C. E. Norelius, Director

Division of Projects and

Resident Programs

Enclosures:

1. Appendix, Notice

of Violation

2. Inspection Report

No. 50-305/83-01(DPRP)

cc w/encls:

D. C. Hintz, Plant

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Section

Stanley York, Chairman

Public Service Commission

RIII II RIII RIII

'

Td yv y 3'

Nelson /jp Jac[Kiw Streeter N

4/4/83 It/q p['[ f)

-. - - . _ . . -

.- _ .- _- _ , . _ . .. _ . . _ _