ML20204G047
| ML20204G047 | |
| Person / Time | |
|---|---|
| Site: | Kewaunee |
| Issue date: | 04/11/1983 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Giesler C WISCONSIN PUBLIC SERVICE CORP. |
| Shared Package | |
| ML20204G051 | List: |
| References | |
| NUDOCS 8305020349 | |
| Download: ML20204G047 (2) | |
See also: IR 05000305/1983001
Text
.
.
APR 11 1983
Docket No. 50-305
Wisconsin Public Service
Corporation
ATTN:
Mr. C. W. Giesler
Vice President-Nuclear Power
Post Office Box 1200
Green Bay, WI 54305
Gentlemen:
This' refers to the routine safety inspection conducted by Mr. R. L. Nelson
of this office during the period of January 1 - March 2,1983, of activities
at the Kewaunee Nuclear Power Plant authorized by DPR-43 and to the discussion
of our findings with Mr. D. C. Hintz at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in
noncompliance with NRC requirements, as specified in the enclosed Appendix.
A written response is required. With regard to Item 4, your responses
should describe steps you have taken to assure that Type 2 and 3 components
are not installed in Type 1 systems without documentary evidence that the
items conform to Type 1 requirements. Your description should include
information such as the number and identifying number of design changes,
modifications, and maintenance work requests reviewed, results of review,
and any corrective actions resulting from the review.
In accordance with 10 CFR 2.790(a), a copy of this letter and the
enclosure (s) will be placed in the NRC Public Document Room unless you
notify this office, by telephone, within ten days of the date of this
letter and submit written application to withhold information contained
therein within thirty days of the date of this letter.
Such application
must be consistent with the requirements of 2.790(b)(1).
If we do not
hear from you in this regard within the specified periods noted above, a
copy of this letter, the enclosure (s), and your response to this letter
will be placed in the Public Document Room.
fo$000N5
R
Z 80/
_-.
-
_.
._
-
. - .
-
_ .
.
.
t
.
Wisconsin Public Service
2
Corporation
The responses directed by this letter (and the accompanying Notice) are
not subject to the clearance procedures of the Office of Management and
Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Original signed by C. E. Norelius
C. E. Norelius, Director
Division of Projects and
Resident Programs
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Report
No. 50-305/83-01(DPRP)
cc w/encls:
D. C. Hintz, Plant
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Section
Stanley York, Chairman
Public Service Commission
RIII
II
RIII
RIII
Td yv
Jac[Kiw
y 3'
'
Nelson /jp
Streeter
N
4/4/83
It/q
p['[ f)
-.
-
-
.
. .
-
.-
.- _- _ , . _ .
..
_ . .
_
.
- -
.
_