ML20204G032
| ML20204G032 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 04/15/1983 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dolan J AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| Shared Package | |
| ML20204G036 | List: |
| References | |
| NUDOCS 8305020347 | |
| Download: ML20204G032 (2) | |
See also: IR 05000315/1983001
Text
.
~
t
i+3
-
APR 15 1983
Docket No. 50-315
Docket No. 50-316
American Electric Power Service
Corporation
Indiana and Michigan Electric Company
ATfN:
Mr. John E. Dolan
Vice Chairman
Engineering
2 Broadway
'
New York, NY 10004
Gentlemen:
This refers to the special inspection of quality assurance activities
conducted by Messrs. N. DuBry, J. Heller, M. Holzmer, J. Peschel, and
E. Swanson of this office on January 17-21, 1983, of activities at
Donald C. Cook Nuclear Plant, Units 1 and 2, authorized by NRC Operating
Licenses No. DPR-58 and No. DPR-74 and to the discussion of our findings
with Mr. R. Hunter and others of your staff at the conclusion of the
inspection on February 17, 1983.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
The purpose of the inspection was to assess the effectiveness of your QA/QC
program in selected areas as a result of a number of events that occurred
at the plant during the past year. No items of noncompliance with NRC
requirements were identified during the course of this inspection. However,
the enclosed report documents several weaknesses which are identified as
Unresolved Items. We understand that you will thoroughly evaluate each
Unresolved Item and propose programs of corrective actions in a supplement
~
to your Regulatory Performance Improvement Program. Due to the number of
weaknesses we identified in the limited number of areas inspected, we
recommend that you conduct or have others conduct a comprehensive review
of the effectiveness of your QA/QC organization and program. We plan to
review the status of your corrective actions during subsequent inspections
and during meetings on your Regulatory P'erformance Improvement Program.
,
l
8305020347 830415
PDR ADOCK 05000315
G
l
_]l$0
.
. .
__
_
_
.
.
t
American Electric Power Service
2
Corporation
.
In accordance with 10 CFR 2.790(a), a copy of this letter and the
enclosure (s) will be placed in the NRC Public Document Room unless you
notify this office, by telephone, within ten days of the date of this
letter and submit written application to withhold information contained
therein within thirty days of the date of this letter. Such application
must be~ consistent with the requirements of 2.790(b)(1).
If we do not
hear from you in this regard within the specified periods noted above, a
i
copy of this letter and the enclosed inspection report will be placed in
the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Original signed by C. E. Norelius
!
C. E. Norelius, Director
Division of Project and
Resident Programs
Enclosure:
Inspection Report
No. 50-315/83-01(DPRP);
No. 50-316/83-01(DPRP)
a
cc w/ enc 1:
W. G. Smith, Jr., Plant Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
J
Ronald Callen, Michigan
Public Service Commission
EIS Coordinator, USEPA, Region 5 Office
.
.
RIII
RIII
,FIII
RIII
RIII
Artk
hk
Wd
'
,
Holzmer/jp
Bo
Hawkins
Stheeter
d',
is
r
j83
Ll/lq
q ')
l
4/13/83
,/ 1