Text
t Omaha Public Power District 1623 Harney Ornaha. Nebraska 68102-2247 402/536 4000 July 29, 1986 TS-FC-86-527 LIC-85-372 Document Control Desk U.S. fluclear Regulatory Commission Washington, DC 20555
Reference:
Docket flo. 50-285 Gentlemen:
IE Bulletin 86-02 Static "0" Ring Differential Pressure Switches Omaha Public Power District (0 PPD) received the subject bulletin dated July 18, 1986.
This bulletin required specific actions of licensees.
The actions re-quired of all holders of operating licenses are detailed in the enclosure to this letter, followed by the written report required in paragraph 1.
Our re-sponse to paragraph 1 indicates that the actions described in paragraphs 2, 3, 4, 5 and 6 of the subject bulletin are not required. As requested, the written report is being submitted under oath or affirmation to the Regional Administra-tor of Region IV, and a copy is attached to this letter.
If you have further questions concerning this matter, please coritact us.
Sinc rely, 0608040269 060729 m-f '
PDR ADOCK 05000285 O
PDR R. L. Andrews Division Manager fluclear Production RLA/rh cc:
LeBoeuf, Lamb, Leiby & MacRae 1333 flew Hampshire Avenue, fl.W.
Washington, DC 20036 Mr. Robert D. Martin, Regional Administrator
[g//
Mr. D. E. Sells, flRC Project Manager Mr. P. H. Harrell, flRC Senior Resident inspectc d'
- c. w i
- y. n,,, i
.u m,s.,
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of
)
)
Omaha Public Power District
)
Docket No. 50-285 (Fort Calhoun Station,
)
Unit No. 1)
)
AFFIDAVIT R. L. Andrews, being duly sworn, hereby deposes and says that he is duly author-ized to sign and file with the Nuclear Regulatory Commission the attached re-sponse to IE Bulletin 86-02 dated July 18, 1986; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.
R. L. Andrews Division Manager Nuclear Production STATE OF NEBRASKA)
)
ss COUNTY OF DOUGLAS)
Subscribed and sworn to before me, a Notary Public in and for the State of Nebraska on the M*
day of July,1986.
) "" M AL mu p D "' * * ',
\\ Notary Pu611c
Response to IE Bulletin 86-02 Static "0" Ring Differential Pressure Switches Actions Reauired of All Licensees:
Within 7 days, submit a report on the extent to which SOR Model 102 or 103 dif-ferential pressure switches are installed (cr planned) at electrical equipment important to safety, as defined in 10 CFR 50.49(b). Include in the report:
the model number of the switch, the system in which it is installed (e.g., low pres-sure safety injection), the application of the switch (e.g., water level mea-surement, system flow measurement), and the function of the switch (e.g., con-trol of minimum flow recirculation valve). A negative report, if appropriate, is required.
OPPD Response An investigation has been conducted and it has been determined that there are no SOR Model 102 or 103 differential pressure switches installed or planned for installation as electrical equipment important to safety, as defined in 10 CFR 50.49(b) at the Fort Calhoun Station.
Actions Reauired of Licensees That Have S0R Model 102 or 103 Differential Pres-sure Switches Installed in Systems That Are Sub.iect to Limitina Conditions for Operation in Technical Specifications:
Paragraphs 2, 3, 4, 5 and 6 of the subject bulletin detail actions for licen-sees that have SOR Model 102 or 103 differential pressure switches installed in systems that are subject to limiting conditions for operations in Technical Specifications.
OPPD Response No further action is required by 0 PPD since the Fort Calhoun Station does not have any SOR Model 102 or 103 differential pressure switches installed in sys-tems that are subject to limiting conditions for operations in Technical Spec-ifications.