ML20204F519

From kanterella
Jump to navigation Jump to search
Final Deficiency Rept Re Interference Between Rear Attachment Brackets & Mechanical Snubber Pivot Mount Brackets.Initially Reported on 830325.Rear Brackets Will Be Returned to Itt Grinnel for Reworking
ML20204F519
Person / Time
Site: Marble Hill
Issue date: 04/22/1983
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, 583-16, SVP-0024-83, SVP-24-83, NUDOCS 8305020118
Download: ML20204F519 (1)


Text

PUBLIC SERVICE INDIANA April 22, 1983 S. W. Shields S83-16 Senior Vice President . SVP-0024-83 Nuclear Division Mr. James G. Keppler, Docket Nos.: STN 50-546 Regional Administrator STN 50-547 U. S. Nuclear Regulatory Commission Construction Permit Nos.:

Region III CPPR - 170 Glen Ellyn, Illinois 60137 CPPR - 171 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On March 25, 1983, Mr. L. G. Yeager of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). ITT Grinnell notified PSI of the potential for an interference to exist between the rear attachment brackets and the ITT Grinnell Figure 306/307 mechanical snubber pivot mount brackets. These interferences could restrict the movement of the snubber to less than the designed movement of five degrees minimum. An inspection performed by ITT Grinnell personnel at Marble Hill verified the presence of unacceptable snubber conditions at Marble Hill.

As a result of the above mentioned inspection, PSI will return the rear brackets to ITT Grinnell for reworking to bring them into compliance with design requirements.

This letter is intended to fulfill the requirements of a final report as required by 10 CFR 50.55(e). If you have any questions regarding this matter, please contact me at your convenience.

Sincerely, eg'Og S. W. Shields caEe Oh SWS/LGY/bak 00 CD g o cc: Director of Inspection and Enforcement x U. S. Nuclear Regulatory Commission o"8 Washington, D. C. 20555 rup b J. E. Konklin

$$ J. F. Schapker ZGs,,7 ac.m L kpg 2 5 \@

P. O. Box 190, New Washington, Indiana 47162 812. 289. 3000