bmd 0982-L ILLINDIS POWER COMPANY U-10052 IP CLINTON POWER STATION, P.O. BOX 678. CLINTON, ILLINOIS 61727 April 20, 1983 FRINCIPAL staff'h vRA J4 2 NF O/RA SCS l

Docket 50-461 AlRA 50 2RP 3 LO,

v Mr. J. G.

Koppler m]f/

twu i ic'~~

p Regional Administrator Ws L

Nuclear Regulatory Commission

- pF c

l Region III

. ra i

4 799 Roosevelt Road Dt_ q pddi n Glen Ellyn, Illinois 60137

Reference:

Letter, D.

P.

Hall to J.

G.

Keppler dated April 13, 1983; Overinspection and Record Verification Program

Subject:

Overinspection and Record Verification Program

Dear Mr. Keppler:

The referenced letter submitted revisions to procedures to your Mr.

F. Jablonski and Mr. H. Livermore and requested your review and conc,urrence.

The revisions were provided to ensure that you have a copy of the latest revisions; the request for review and concurrence is withdrawn.

If you have any questions concerning this matter, please contact Illinois Power Company.

Sincerely yours, Ia 1 Vice President RLB/jb cc:

Manager-Quality Assurance Director-Office of I&E, US NRC, Washington, DC 20555 Illinois Department of Nuclear Safety US NRC Senior Resident Inspector 8305020111 830420 DR ADOCK 05000461 PDR SE C/

APR 2 5 083

- - - -. -