APR 131983
,
Docket Nd. 50-454
Docket No. 50-455
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
i
Chicago, IL 60690
Gentlemen:
i
This refers to the routine safety inspection conducted by Mr. M. A. Ring.
of this office on February 24, 25, 28, March 1-4, 7-9, 1983, of activities
at Byron Nuclear Power Station authorized by NRC Construction Permits No.
CPPR-130 and No. CPPR-131 and to the discussion of our findings with
Mr. R. Ward and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a celective
examination of procedures and representative records, observations, and
<
)
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response is required.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)
will be placed in the NRC Public Document Room unless you notify.this-' office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter. Such application must be consistent with the re-
quirements of 2.790(b)(1).
If we do not hear from you in this regard.within
the specified periods noted above, a copy of this letter, the enclosure (s),-andl
your response to this letter will be placed in the Public Document Room.
The responses directed by this letter (and the accompanying Notice) are
not subject to the clearance procedures of the Office of Management and -
Budget as required by the Paperwork Reduction Act of-1980, PL 96-511.
.,
r
8304290075 830413
'
PDR ADOCK 05000454
_ G ..
pg
<
. ,
t
'
. - -
- .
.
- .
-
I
. t,'
.
MB 13 1983 -
Commonwealth Edison Company
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
EW 3"
W. S. Little,_ Chief
Engineering Branch
Enclosures:
1.
Appendix, Notice
of Vioation
2.
Inspection Reports
No. 50-454/83-12(DE);
No. 50-455/83-10(DE)
cc w/encls:
D. L. Farrar, Director
'
of Nuclear Licensing
V. I. Schlosser, Project Manager
Gunner Sorensen, Site Project
Superintendent
'
R. E. Querio, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII Byron
Resident Inspector, RIII
Braidwood
~
Philip L. Willman, Esq.
Assistant Attorney General
Environmental Centrol Division
Reed Neuman, Esq., Assistant
Attorney General
Myron M. Cherry
Diane Chavez, DAARE/ SAFE
RI
R
RIII{
RIII
-
ng/
._ fg y
q/,;lM
'
es
.L t le
8/8
s2-
4 m-
-wy