ML20204E802
| ML20204E802 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 07/25/1986 |
| From: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| Shared Package | |
| ML20204E808 | List: |
| References | |
| NUDOCS 8608010261 | |
| Download: ML20204E802 (3) | |
See also: IR 05000440/1986019
Text
.
.
JUL 251986
,
Docket No. 50-440
Docket No. 50-441
The Cleveland Electric Illuminating
Company
ATTN: Mr. Murray R. Edelman
Vice President
Nuclear Group
Post Office Box 5000
Cleveland, OH 44101
Gentlemen:
This refers to the routine safety inspection conducted by J. Foster and other
representatives of this office on July 7-11, 1986, of activities at Perry
Nuclear Power Plant, Units 1 and 2, authorized by NRC Facility Operating
License No. NPF-45 and Construction Permit No. CPPR-149, and to the discussion
of our findings with Mr. E. Riley and others of your staff at the conclusion
of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
During the exit interview, we received commitments to revise your Emergency
Plan to include provisions for periodic shift augmentation drills, and to
perform a detailed review of your Emergency Action Levels (EALs).
Actions
taken to fulfill these commitments will be reviewed in a subsequent inspection.
Open Items that were identified during this inspection are summarized in
Enclosure A to this letter.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, and the enclosures, will be placed in the NRC Public Document Room.
f
8608010261 860725
hh
ADOCK 05000440
G
3
s
.
Th C veland Electric Illuminating
2
JUL 251986
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
woriginal sfeed W T D
F"
W. D. Shafer, Chief
Radiological Protection Branch
Enclosures:
1.
Enclosure A
Open Items
2.
Inspection Reports
No. 50-440/86019(DRSS);
No.50-441/86004(DRSS)
cc w/ enclosures:
F. R. Stead, Manager, Perry
Plant Technical Department
M. D. Lyster, Manager, Perry Plant
Operations Department
E. M. Buzzelli, General Supervising
Engineer, Nuclear Licensing and
Fuel Management Section
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
l
Terry J. Lodge, Esq.
James W. Harris, State of Ohio
Robert H. Quillin, Ohio
Department of Health
l
l
l
RIII
RIII
RIII
RIII
RII: !
WGSh
wt,Sf
R e
Shr
i
WGS e
O
l
Fosted/mj
Smith
Snel
K p
l
r/a/*
w/s'
$5'
j'g
l
yes
yo
yo
Y"
L
.
___ ._ _
.
ENCLOSURE A
Open Items
1.
The conditions listed in the Perry Nuclear Power Plant Emergency Plan
(PNPPEP) corresponds to the guidance contained in NUREG-0654, Appendix 1.
However, some of the distinctly observable events that guide the user to
'
the emergency condition level are suspect or ambiguous. Several examples
are listed in the appendix to this report. The licensee has committed to
perform a detailed review of the EALs. This will be tracked as Open Item
(No. 440/86019-01; No. 441/86004-01).
2.
The licensee was encouraged to incorporate semiannual activation of
emergency call-out procedures into their emergency preparedness plan
and drill program. A commitment to this effect was received at the
exit interview. This will be tracked as Open Item No. (440/86019-02;
No.441/86004-02).
.
!
!
.
-