ML20204E226
| ML20204E226 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 10/14/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20204E230 | List: |
| References | |
| NUDOCS 8810210313 | |
| Download: ML20204E226 (2) | |
See also: IR 05000313/1988031
Text
---.
",
g, ,
'
OCT I 4 BB8
-
Docattnent Contains
In Reply Refer To:
SAFEGUARDS INf0RMATidN
Dockets:
50-313/88-31
50-368/88-31
Arkansas Power & Light Company
ATTN:
Mr. Gene Campball
Vice President, Naclear
Operations
P.O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Messrs. J. A. F. Kelly, and R. A.
Caldwell of this office during the period September 13-16, 1988, of activities
authorized by NRC Operating Licenses DRP-51 and NPF-6 for Arkansas Nuclear One,
Units 1 and 2, and to the discussion of our findings with Mr. J. M. Levine and
other members of your staff at the conclusion of the inspection.
Certain areas within the security program were examined during the inspection.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the NP.C inspectors. The inspection findings are documented in
the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of HRC requirements.
The NRC inspectors reviewed your corrective
actions taken during the inspection uhich included immediate corrective steps
and corrective steps which will be taken to avoid further violations.
Therefore, no response to the Notice of Violation attached to this letter is
!
required.
I
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
,
paragraph 2 of the enclosed report.
l
The material enclosed herewith contains Safeguards Information as defined by
10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the
materiel, with the exception of the report cover page which is an inspection
summary, will not M placed in the Public Document Room.
RIV:SEPS:RpB
SEPS:R
C:
- ROB
C:
C:
BA
0:
M
!
'
AKelly;1w
RCeldw
RJ
tt
BM
DChamberlain
LJCallan
t /p/88
g /p /88 (c /j3/88
10/ /(/88
b
p /g-/88
jo /t /88
ENCLOSlHIE CONTAINS
.
Dnciv,wnt Contains .
SAFEGUArtOS INfMMN
SAFEGUARDS Ifif 0RMATl0fl
UPON SEPAllATION MS
t\\
as10210313 881014
PAGE IS DECONTROLLID
gDR
(4 DOCK 0500pf3
-
.o.
,
~
.
Arkansas Power & Light Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Slgned Ily
A. D. lleacli
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-313/88-31
50-368/88-31
cc w/ summary page only:
Arkansas Nuclear One
ATTN:
J. M. Levine, Director
Site Nuclear Operations
P.O. Box 608
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
bec copy of entire report:
RIV Security File
P. A. Starcher, RSGB/NRR
R. D. Martin, RA
R. L. Bangart, DRSS
Chief, RPB
Section Chief, SEPS:RPB
Security Inspectur (3)
Resident Inspector
SEPS:RPB File
G. F. Sanborn, E0
D. M. Crutchfield, NRR
bec copy of letter and inspection summary only w/766:
ORP
Lisa Shea, RM/ALF
Section Chief, ORP/A
RIV File
MIS
RSTS Operator
R. E. Hall, DRSS
Project Engineer, DRP/A
bec copy of letter and inspection summary only w/out 766:
DMB IE-04
C. Harbuck, NRR Project Manager
ENCLOSURE CONTAINS
SAFEGUARDS INf0RMAil0N
UPON SEPARAil0N THIS
PAGE IS DECONTROLLED
'
-