ML20204D275

From kanterella
Jump to navigation Jump to search
Forwards Request for Design Change Which Replaces List Transmitted in .Rev & Corrections Are Noted Re Seismic Piping Restraints & Snubbers
ML20204D275
Person / Time
Site: 05000514, 05000515
Issue date: 11/20/1978
From: Rachel Johnson
PORTLAND GENERAL ELECTRIC CO.
To: Mccollom K, Mark Miller, Paxton H
AFFILIATION NOT ASSIGNED, Atomic Safety and Licensing Board Panel
References
NUDOCS 7812140211
Download: ML20204D275 (8)


Text

-O '

PUBLIC DOCUMENT gqcy

~~' j M '~"' .

. ,, hrfD Colmnspoyntygg goqa -;;3rC8C d G S C STCi =_,,S O T.0 C C Tr p 2 G y

..l ~ M $23 November 20, 1978 Marshall E. Miller, Esq., Chairman Atomic Safety and Licensing Board ,g 9 U. S. Nuclear Regulatory Commission Washington, D. C. 20555 .4

'p A gs i%

Dr. Kenneth A. McCollom, Dean [g.r -

Division of Engineering, Architecture & Technology j [ g'( h *p TTY ~,

9 Oklahoma State University .

Stillwater, Oklahoma 74074 /

4 Dr. Hugh C. Paxton to f 1229-41s t Street Los Alamos, New Mexico 67544 Gentlemen:

, Attached to this letter is a revised list of Requests for Design Changes (RDCs) . which replaces the list transmitted to you by my letter of November 9, 1978. Field checking and design development of seismic piping restraints and snubbers has led to revisions of some of the items on our list of November 9, 1978. In addition, some items were incorrectly described in the earlier list. The revisions and corrections are as follows:

Job 1 The elevation has been corrected to 37.

Job 2 The location has' been corrected to the Fuel Building.

Job 4 The attachment location has been revised to the floor.

Job 5 The restraint has been changed to a rigid hanger on 24-in. CCW piping attached to floor support steel in the Fuel Building. .

Job 7 The attachment location has been revised to the floor, and the snubber number has been' changed.

Job 8 The elevation has been reviced to 46 f t, and the location corrected to the Fuel Building.

Job 9 The snubber has been revised to a rigid restraint ,

attached to a structural steel column, and the support number revised to suit.

A

\

781214O2lI

_ .. ._ y s t:c : ::.

- Rytiano GenNal Eectne Messrs. Miller,.McCollom'and Paxton.

- November 20,.1978?

Page two-t 5

Job 10' . Attachment location 'has been revised to the wall.

Job 11 This;-job;has been changed from addition of a snubber ,

to relocation of an existing rigid restraint' and L revision of the restraint number.

Job 13 - The restraint number has been. changed.

Job 14' The snubber has been' revised to a modificatior af ' a structural steel restraint, and the support number i revised:to suit.- -

Job 16 Attachment location has been revised to structural-floor support steel.--

.l Job'17 The snubber has been revised to a rigid restraint.-

The line and support numbers have been changed. e Job 18 Location in the Auxiliary Building has been' designated.

The revised list is provided as Attachment 1. Provided as Attachment 2 ~

is a' new list of Requests for Design Change and another work item which supplements previous lists. As. before, the items on these lists will' not affect the load carrying capabilities of any major shear wall.

The Licensee will continue to keep the Board informed of all activities-at Trojan which may be construed- as being related to the Trojan Control Building.

Sincerely,.

%JLw. JA~

Ronald W. Johnson Corporate Attorney Portland General Electric Company  !

l RWJ/LWE/kk/4crwTICBB29 ,

Attachment j c: R. H. Engelken Nuclear Regulatory Commission, Region V-  ;

~

A. Schwencer Nuclear Regulatory Commission S.

--,,,-~.---,-%,4-, .,_s-,., . $ w .. %, e E, ,e. .,.,-yd- ~,,,,,,+..mw,,v4 ,,*s v

I .-

'"h

,, G COIULEUM'DDTZ (Revised Novambar 20, 1978)

ATTACHMENT 1 co on (j) Sk Following is the list of Request for Design Change (RDC) work ems?d5k

)'

which field work may be performed within the next few weeks. k The relationship of the work with the Control, Auxiliary and .,1

~~

Ngh ' p Y :

g e., Ts.s Building structures is briefly summarized below:

d

//

ag.<$s*

RDC No. A /

Modification Relationship

, . , 6 6) .78-095 Joh #1: Restraint addition A strut assembly with a pipe to Component Cooling Water attachment will be added to (CCW) line EBD-28-1 (SR-301) the vertical run of 12" dia-meter CCW line and will be attached to a wall in the Auxiliary Building at elevation 37'.78-095 Job #2: Restraint addition A strut assembly will be to CCW line HBD-22-4 (SR-300) connected to the vertical run of 4" diameter CCW piping and attached to a wall in the Fuel Building at elevation 56'.78-095 Job #3: Restraint addition A strut assembly will be '

to CCW line HBD-22-3 (SR-300) added to a horizontal run of 4" diame ter CCW piping. The assembly will be attached to a wall in the Auxiliary Building-at elevation 66' .78-095 Job #4: Restraint addition A strut assembly at elevation to CCW line RBD-31-2 (SR-301) 76' will be attached to the floor. This restraint is for a vertical run of 14" diameter CCW piping in the Auxiliary Building.78-095 Job #5: Restraint addition This rigid hanger assembly to CCW line HBD-27-3 (SR-300) will be added to 24" diameter

& CCW piping in the Fuel Building at elevation 53' . The assembly will be attached to floor support steel.78-095 Job #6: Snubber addition to A mechanical snubber assembly

'CW line HED-28-2 (SS-300)

C attached to a wall in the Auxiliary Building will be added as a restraint to a 12" diameter CCP line at elevation 53' .

.s

' j RDC;No. Modification Relationship 1

78-095 Job #7: Snubber addition to A snubber' assembly at elesation CCW line HBD-27-3 (SS-301) 53' will be connected to the 1 CCW line and attached-tofthe floor at elevation 45' of the

~

Fue1L Building.78-095 Job #8: . Snubber addition - to one snubber assembly will-be  !

CCW line EBD-27-3 (SS-302) attached to a pipe' stanchion i welded to the 24" diameter CCW q line at elevation 46and "

. attached to a wall in the I Fuel Building. l 1

78-095 - Job #9: Restraint addition. A structural steal restraint  !

to CCW.line HBD-27-4 (SS-300) for the CCW line - will be. I attached toEexisting piping 1 restraint steel in the Auxiliary Building at I elevation 46' . I 78-095 Job #10: Restraint addition A seismic restraint will be to CCW line HBD-33-1 (SR-300) installed on a CCW line at elevation 69' mounted to -

a wall of the Auxiliary Building.78-095 Job #11: Relocation of a A~ strut assembly will be i restraint on CCW line attached the floor in the. i HBD-33-1 (SR-301) Fuel Building and connected to an 8" diameter CCW line at elevatio'n 64' .78-095 Job #12: Snubber addition A snubber assembly will be to Safety Injection Pump connected to a steel beam ,

discharge line attached to the concrete t SI-1501R-1-1(SS-300) flocr in the Auxilfary.

Building for the vertical run of 4" diameter Safety  ;

Injection Pump discharge line l at elevation 64'.

l.

3 78-095' Job #13:' Rastraint addition An additional structural  !

to Residual Heat Removal _ steel seismic restraint for (

(RHR) line HCC-39-2 (SR-300) a1 horizontal'run of the 4" 1 RHR.line to the Spent Fuel  !

Pool line will be attached to S a wall of the Auxiliary Building at elevation' 85' .

I r

i P

[. . , -

\ v RDC No., Modification Relationship-78-095 Job #14: Restraint addition

~

A structural steel' restraint to Containment Spray Pump ~

'will be' attached to existing discharge line structural ste'el at elevation GCB-9-1 (SR-300) 15 ' for the 10" diameter Containment spray pumps discharge line. The line is  ;

located in the Auxiliary Building. )i I

78-095. Job ' #15 : Snubber addition A snubber assembly with steel to Containment Spray Pump beams attached to. a wall of r discharge-line . the Auxiliary Building will  !

GCB-9-1 (SS-301)' be installed in the vertical run of a 10" diameter Contain .

ment Spray Pump discharge line

  • i at' elevation 22'.

~

78-095 Job #16: Snubber addition A snubber assembly attached to Containment Spray Pump to structural floor support discharge line steel in the Auxiliary Building GCB-9-1-(SS-302) will be installed for the vertical run of a 10" diameter. ,

Containment Spray Pump discharge line at elevation 53' .78-095 Job #17: Restraint addition A s trut assembly will be to Containment Spray Pump mounted to a wall of the discharge line Auxiliary Building.for the GCB-9-1 (SR-303) 10" diameter containment Spray Pump discharge line at elevation 59'.78-095 Job #18: Restraint addi- This modification adds an tion to Chemical and Volume angle support to an exist-and Control System (CVCS) ,ing support for a 3" CVCS line CS-2501R-28-2 (SR-300) line. The pipe is located in the Auxiliary Building at elevation 83'.

TEB/jf /CB-B25

% g '*%,

ATTACHMENT 2 0 4 Ce Following is the list of Request "for Design Change (RDC)-and other work items for which field work may be performed within the next few weeks.

The relationship of the work with the Control, Auxiliary and Fuel Building structures is briefly summarized below:

RDC No. Modification Relationship 78-095 Job #19: Snubber addition A pair of mechanical snubber DCP #2 to CVCS line CS-151R-12-5 assemblies will be added to the (SS-300) 3" diameter CVCS piping at Elevation 86 in the Auxiliary Building. The assembly will be attached to a wall.

MR Addition of access ladder to Two ladders will be attached to 4282 Decontamination Shop HVAC nonbearing walls at the south equipment end of the Decontamination Shop at Elevation 93 in the Fuel Building. g m

< c tAfh'

$ - fl% y \T k

4 '$jv,6e h h LWE/4kk5B9

  • ~'

C y

" % aiu> ;;,0N Q %' '

.~Q" f ,

f 9

UNIIED STATES OF' AMERICA f N5 h NUCLEAR REGULATORY COMMISSION .g h* q NNg 7 -

i L?" p .

2 C

BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

) Docket 50-344 PORTLAND GENERAL ELECTRIC COMPANY, ) .

et al ) (Control Building Proceeding) ,

)

(Trojan Nuclear Plant) )

CERTIFICATE OF SERVICE I hereby certify that on November 20, 1978, Licensee's letter dated November'20 with attached lists of Requests for Design Change and other work items has been served upon the persons listed below by depositing copies thereof in the United States mail with proper postage affixed for first class mail.

Marshall E. Miller, Esq.', Chairman Atomic Safety and Licensing Board Atomic Safety and Licensing Board Panel U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Washington, D. C, 20555 Washington, D. C. 20555 Dr. Kenneth A. McCollom, Dean Atomic Safety and Lf censing Appeal Division of Engineering, Board -

Architecture and Technology U. S. Nuclear Regulatory Commission Oklahoma State University Washington, D. C. 20555 Stillwater, Oklahoma 74074 Robert M. Johnson, Esq.

Dr. Hugh C. Paxton Assistant Attorney General 1229 - 41st Street 100 State Office Building Los Alamos, New Mexico 87544 Salem, Ora.gon 97310 Joseph R. Gray, Esq. Robert Lowenstein, Esq.

Counsel for NRC Staff lowenstein, Newman, Reis & Axelrad U. S. Nuclear Regulatory Couission Suite 1214 Washington, D. C. 20555 1025 Connecticut Ave. , N. W.

~

Washington, D. C. 20036 Columbia County Courthouse Law Library Mr. Eugene Rosolie Circuit Court Room Coalition for Safe Power St. Helens, Oregon 97051 215 S. E. 9th Avenue Portland, Oregon 97214 Ms. Nina Bell 632 S. E.18th' Street Mr. Stephen M. Willingham Portland, Oregon 97214 555 N. Tomahawk Drive Portland, Oregon 97217

. . l e .

1 1

CERTIFICATE OF SERVICE l l

l Columbia Environmental Council John H. Socolofsky, Esq. .

P. O. Box 61-1 Assistant Attorney General St. Helens, Oregon 97051 Of Attorneys for the State of Oregon ,

100 State Office Building 1 Mr. John A. Kullberg- Salem, Oregon 97310 Route 1, Box 250Q Sauvie Island, Oregon 97231 Gregory Kafoury, Esq. -

Counsel for Columbia Environmental Mr. David B. McCoy Council 348 Hussey Lane 202 Oregon Pioneer Building Grants Pass, Oregon 97526 320 S. W. Stark Portland, Oregon 97204 Ms. C. Gail Parson P. O. Box 2992' William Kinsey, Esq.

Kodiak, Alaska' 99615 Bonneville Power Administration P. O. Box 3621 Docketing and Service Section fortland, Oregon 97208 ,

1 Office of the Secretary U. S. Nuclear Regulatory Commission ,

Washington, D. C. 20555 1 Oh bO, W Ronald W. Johnson Corporate Attorney h

Portland General Electric Company.

Dated: November 20, 1978

- , _ , - . - . - _ _ . . . . _ , ~ . , _ - . , _ ._ . , _ . _ . _ .