Forwards IE Inspec Repts 50-456/78-10, 50-457/78-10 on 780908,12-14 & Notice of Violation
ML20204C807
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 10/19/1978
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML20204C811 List:
References
NUDOCS 7812050236
Download: ML20204C807 (2)


See also: IR 05000456/1978010

Text

-

T

f

f

p**"%

UNITED STATES

s

&

NUCLEAR REGULATORY COMMISSION

f.

,1 j

'

REGION lli

e

too noosEvsLT noAo

%, e q ' [

oLEN E LLYN, ILLINotS 60137

.....

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN:

Mr. Byron Lee, Jr.

Vice President

P. O. Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Messrs. C. M. Erb,

F. C. Hawkins and E. J. Gallagher of this office on September 8, 12,

13 and 14, 1978, of activities at Braidwood Nuclear Power Station,

Units 1 and 2 authorized by NRC Construction Permits Fo. CPPR-132 and

No. CPPR-133 and to the discussion of our f1ndings with Mr. Cosaro

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during ne inspection. Within these areas, the inspection consisted of

a selectLve examination.of procedures and representative records,

observations, and interviews with personnel.

During this inspection, certain of your activities appeared

to be in noncompliance with NRC requirements, as described

in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations. Section 2.201 requires you

to submit to this office within thirty days of your receipt

'

of this notice a written statement or explanation in reply,

including for each item of noncompliance: (1) corrective

action taken and the results achieved; (2) corrective action

to be taken to avoid further noncompliance; and (3) the date

wherffull compliance will be achieved. In regard to item B of

Appendix A, during the inspection you initiated action to correct this

matter in a timely manner and to prevent recurrence. Consequently,

no reply to this item is required.

"**T5Ibf *

7812050236

d

..

.-

.

.

.

.

..

-

..

.

- - . .-

--

-

_

,

4

.

Commonwealth Edison Company

-2-

I)CT10T97BI

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows. If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this' office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application must

include a full statement 'of the reasons for which the information is

considered proprietar'y, and should be prepared so that proprietary

information identified in the application is contained in an enclosure

to the application.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

Y

g_ _

'

3

3. F. Heishman, Chief

Reactor Construction and

Engineering Support. Branch

Enclosures:

1.

Appendix A, Notice of

Viola, tion

2.

IE Inspection Reports

No. 50-456/78-10

and No. 50-457/78-10

cc w/ enc 1:

R. Cosaro, Project

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

/ TIC

Mr. Dean Hansell, Office

of Attorney General

. _.

. . - _

,, _

. . . _

_ . _ . . _ _..

_

_

_ - . _ , .

-

.

-

. .