k OPERATING DATA REPORT DOCKET NO.
50-298 DATE 10-5-78 COMPLETED BY P..T - Enter TELEPHONE 402-825-3811 OPERATING STATUS Notes
- 1. Unit Name:
Cooper Nuclear Station
- 2. Reporting Period:
September 1978 2381
- 3. Licensed Thermal Power (MWt):
836
- 4. Nameplate Rating (Gross MWe):
- 70
- 5. Design Electrical Rating (Net MWe):
787
- 6. Maximum Dependable Capacity (Gross MWe):
764
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To Which Restricted. lf Any (Net MWe):
None
- 10. Reamns For Restrictions,if Any:
i This Month Yr.-to Date Cumulatise
- 11. Hours In Reporting Period 720 6551 17.272
- 12. Number Of Hours. Reactor Was Critical 720 5790.2 31.245.9
- 13. Reactor Reserve Shut town Hours 0
0 0
- 14. Hours Generator On-Line 720 5758.4 30,594.2
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1,381,656 10,904,208 55,945,710
- 17. Gross Electrical Energy Generated (MWH) 450.640 1,561,286 17.891,256
- 18. Net Electrical Energy Generated (MWH) 435.862 3.449.088 17.225.825
- 19. Unit Service Factor 100.0 87.9 82.1
- 20. Unit Availability Factor 100.0 87.9 82.1
- 21. Unit Capacity Factor (Using MDC Net) 79.2 68.9 60.5
- 22. Unit Capacity Factor (Using DER Net) 77.8 67.7 59.4
- 23. Unit Forced Outage Rate 0.0 0.4 5.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each1:
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Ac'.;eved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 7 0/o/70 A.ff yn
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-298 UNIT Cooper Nuclear Stat.
DATE October 5, 1978 P. J. Borer COMPLETED BY 402-825-3811 TELEPHONE MONTH September DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 460 1
609 37 603 2
gg q, g 3
598 19 517 4
All 20 522 699 523 5
21 73 532 6
728 547 7
23 g
739 24 581 l
701 9
25 626 fi 6 26 607 c
10 11-707 27 608 12 704 588
,g 624 608 13
,9 14 619 30 606
]
15 618 3j 16 357 INSTRUCTIONS
~
On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
P/77)
50-298 DOCKET NO.
UNIT SilUTDOWNS AND POWER REDUC 110NS Cooper huclear Station UNIT NAME DATE October 5, 1978 i
COMPLETED BY P.J. Borer REPORT MONTil September 1978 TELEPHONE - 402-825-3811 E
E 5g 3
$ $5 Licensee
,Eg Cause & Corrective 8
Action to No.
Date i
3g d
is@
Esent gg gO F
yE 5
3gc Report e mV Prevent Recurrence o
t u
s 6
78-13 7E9916 S
O H
4 N/A N/A N/A Control Rod Sequence Change 1
2 3
4 F: Forced Reason:.
Method:
Exhibit G-Instructions S: Scheduled A4sluipment Failure (Explain)
I-Manual for Preraration of Data B.Mairitenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NURI G.
D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source (9/77)
Il-Other (Explain)
A 1
COOPER NUCLEAR STATION OPERATIONS NARRATIVE September 1978 The unit operated at an average net generation of 605 MWe.
The unit was operated at a reduced load due to low system load demand and to conserve fuel for the winter peak.
Power was' additionally reduced on September 16 to permit a control rod sequence change.