UNITED STATES s
[
g NUCLEAR REGULATORY COMMISSION 5-j WASHINGTON, D. C. 20555
'+9 * * * #
,o July 28, 1986 s
Docket No. 99901057/86-01 l
Golden Gate Forge & Flange, Inc.
ATTN: Mr. Fred Hawley President Post Office Box 547 South San Francisco, California 94083 Gentlemen:
This refers to the inspection conducted by Mr. James T. Conway and Mr. Owen Gormley 4
of this office on May 30 to June 4,1986, of your facility at Hunters Point, San Francisco, California. This inspection was made as a result of the receipt of a 10 CFR Part 21 report from Consolidated Pipe and Valve Supply (CPVS) per-taining to potential defective flanges manufactured by Golden Gate Forge and Flange (GGFF) and furnished by CPVS to the D.C. Cook and Midland nuclear facilities.
Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector. Our review of QA records indicates that you manufactured flanges for the nuclear industry from 1979 through 1985. Within the scope of this inspection, it was noted that GGFF activities failed to meet certain NRC requirements. Significant items included failures to:
(a) have a procedure addressing Part 21 requirements, (b) pass 10 CFR Part 21 require-ments on to suppliers / manufacturers, and (c) have a documented QA program in-cluding instructions and procedures.
In addition, there was no documented evidence to show that GGFF had been audited or surveyed by their nuclear cus-tomers.
The enclosed Notice of Violation is sent to you pursuant to the provisions of Section 206 of the Energy Reorganization Act of 1974. You are required to submit to this office within 30 days from the date of this letter a written statement containing:
(1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and preventive measures were or will be completed. Consideration may be given to extending your response time for good cause shown.
You are also requeste('.to submit a similar written statement for the item which appears in the enclesed Notice of Noncgnformance.
8607300409 e60728 PDR GA999 EMVGGFFI 99901057 PDR
4 4
Golden Gate Forge and Flange July 28, 1986 In accordance with the requirements of Section 21.21 of 10 CFR Part 21, you are requested to notify your nuclear customers that they received flanges which were not manufactured under an approved QA program which met the requirements of Appendix B to 10 CFR Part 50. You are also requested to submit to this office a copy of your letter and a list of the customers that you notified.
The response requested by this letter is not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
[g 1' signed W Mobert F. Helshman Robert F. Heishman, Chief Vendor Progran Branch Division of Quality Assurance, Vendor and Technical Training Center Programs 1
Office of Inspection and Enforcement
Enclosures:
1.
Appendix A-Notice of Violation 2.
Appendix B-Notice of Nonconformance 3.
Appendix C-Inspection Report 99901057/86-01 4.
Appendix D-Inspection Data Sheet (one page) f i
DISTRIBUTION:
)
_DMB:IE:09 o i
VPB Reading EMerschoff LParker I
JConway (2)
JStone i
BGrimes RHeishman JStone DQAVT Reading 0Gormley 77 HMiller v
V QAVT B:00AVT BC/VP :00AVT choff R Hei)s wffan g(
/gg86 py86 i
i
D Golden Gate Forge and Flange July 28, 1986 In accordance with the requiremtnts of Section 21.21 of 10 CFR Part 21, you are requested to Jotify your nuclear customers that they received flanges which were not manufactured under an approved QA program which met the requirements of Appendix B to 10 CFR Part 50. You are also requested to stbmit to this office a copy of your letter and a list of the customers that you notified.
The response requested by this letter is not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, cb iff U
.obert F. Heishnan, Chief Vendor Program Branch Division of Quality Assurance, Vendor and Technical Training Center Programs Office of Inspection and Enforcement
Enclosures:
1.
Appendix A-Notice of Violation 2.
Appendix B-Notice of Nonconformance 3.
Appendix C-Inspection Report 99901057/86-01 4.
Appendix D-Inspection Data Sheet (one page) i i