Forwards SALP Rept 50-458/86-07 for Jan 1985 - Jan 1986. Category 1 Assigned to Functional Areas of Fire Protection & Startup Testing.Operations,Training & Emergency Preparedness Evaluated as Category 2
ML20204A531
Person / Time
Site: River Bend 
Issue date: 05/05/1986
From: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
GULF STATES UTILITIES CO.
Shared Package
ML20204A532 List:
References
NUDOCS 8605120317
Download: ML20204A531 (2)


See also: IR 05000458/1986007

Text

,%

e

,

%

In Reply Refer To:

g 0a b65

Docket:

50-458/86-07

Gulf States Utilities

ATTN: William J. Cahill, Jr.

Senior Vice President

River Bend Nuclear Group

P. O. Box 2951

Beaumont, Texas 77704

Gentlemen:

This forwards the report of the Systematic Assessment of Licensee Performance

,

(SALP) for the River Bend Station. The SALP Board met on March 25, 1986, to

evaluate performance of the River Bend facility for the period January 1,1985,

through January 31, 1986. The performance analyses and resulting evaluations

are documented in the enclosed SALP Board Report.

The performance of your facility was evaluated in the selected functional areas

identified in Section IV of the enclosed SALP Board Report.

The overall performance of Gulf States Utilities at the River Bend Station

indicates a high level of dedication to nuclear safety and a high degree of

technical competence. The involvement of management in assuring quality and in

resolving technical issues with safety significance is a noteworthy strength.

We encourage your continued close attention to assure that the transition to

operations is carried out smoothly.

Two functional areas, Fire Protection and Startup Testing, were found to be in

Category 1.

There were three functional areas evaluated as Category 2; however,

this was based on limited data.

These three functional areas are Operations,

Training, and Emergency Preparedness. We believe that your performance was

generally strong enough in these areas that with only slight improvement, a

performance Category 1 could be achieved.

Your conplete and rapid reporting of

operating events and your generally thorough assessment of these events were of

particular note. We found that your performance in the functional area of

Licensing was strong throughout the period of licensing. You were assessed a

performance Category 2 in the functional area of Quality Assurance and Admini-

strative Controls, and the SALP Board noted some problems in this area. We are

concerned about the staffing in the auditing and quality surveillance groups and

in the difficulty associated with your assumption of design control activities

from the architect engineer. We believe that continued close management

involvement in resolving these problems is warranted.

Unless you specifically request it, a management meeting will not be scheduled

for this reporting period. Any request for a management meeting should be made

i priting within 10 d ys of receipt y f this report.

'

k

[j

RPB/A

RPB/

RPB

\\

DRS

DRS

RA

WRBennett/tw

JPJa don

JEGag1

<t

o

ison RL

art

RDMartin

,pEHJ

c

L{/g/86

Lj/,(/86

/t3/86

't /j'/; /86

/;t/86

////86

'

8605120317 860505

/

PDR

ADOCK 05000458

'/

G

PDR

,_

_-

--

.

4

Gulf States Utilities

-2-

Any comments which you may have regarding our evaluation of the performance of

your facility should be submitted to this office within 30 days of the date of

issuance of this SALP Board Report. Your comments, if submitted, and our

disposition of them, will be issued as appendices to the SALP Board Report.

Comments which you may submit are not subject to the clearance procedures of

-

.the Office of Management and Budget as required by the Paperwork Reduction Act,

PL 96-511.

Should you have any questions concerning this letter, we shall be pleased to

discuss them with you.

Sincerely,

ORIGINAL SIGNED BY

RQggT.pDF4aT9M

Regional Administrator

Enclosure:

Appendix - SALP Board Report 50-458/86-07

with: Attachment 1 - Licensing Analysis

Attachment 2 - Licensing Supporting

Data and Summary

cc w/ enclosure:

Gulf States Utilities

ATTN:

J.- E. Booker, Manager-

Engineering, Nuclear

Fuels & Licensing

P. O. Box 2951

Beaumont, Texas 77704

Louisiana State University,

Government Documents Department

Louisiana Radiation Control Program Director

bec to DMB (IE40)

bec distrib. by RIV:

  • RPB

Chmn. N. J. Palladino (MS: H-1144)

  • RSB

Comm. P. M. Roberts (MS: H-1149)

  • EP&RPB

Comm. J. K. Asselstine (MS: H-1149)

  • DRSP

Comm. F. M. Bernthal (MS: H-1149)

  • RIV Docket File

Comm. L. W. Zech (MS: H-1149)

  • All RRIs (10)

J. M. Taylor, D/IE

  • MIS System

R. D. Martin, RA

RSTS Operator

  • Section Chief, RpB/A

Records Center, INPO

S. Stern, PM, NRR

E. J. Reis, OELD

  • w/766