Text
Docket No.: 50-424 01 MAY 1986 Mr. Richard Conway Vice President and Project Director Georgia Power Company Box 299A, Rt. 2 Waynesboro, Georgia 30830
Dear Mr. Conway:
Subject:
Transmittal of First Draft of Vogtle Unit 1 Technical Specifications Enclosed is a copy of the first draf t of the Vogtle Unit 1 Technical Specifi-cations, a marked up copy of which was forwarded by letter dated April 9,_1986.
Your staff should alert us to any differences between these two documents that they may find.
This first draft is based on your Technical Specification sub-mittal dated February 28, 1986, and Revision 5 of the Westinghouse Standard Technical Specifications. This document will be the basis of a site visit anticipated for late May to discuss areas where additional information may be required to ensure that final Technical Specifications are consistent with the FSAR, the SER, and the as-built plant design.
If there are any questions on this matter, contact me at (301) 492-7357.
Sincerely,
%\\
Melanie A. Miller, Project Manager PWR Project Directorate #4 Division of PWR Licensing-A
Enclosure:
As stated cc: See next page
. DISTRIBUTION:,w/o enclosure Docket.F11e: u JPartlow 3
NRC PDR BGrimes Local PDR Edordan PRC System SBrown NSIC BClayton PWR#4 Rdg VBenaroya MDuncan e605120022 860501 BJYoungblood Rdg PDR ADOCK 05000424 OELD A
/$R * -A PWR#4/DP
-A f
/mac M
n '
BJYoungblood 04{g/86 04g /8 04/tj/86 0\\