ML20204A004

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Rept 70-1426/86-01 on 860324 & 0402 (Ref 10CFR2.790 & 73.21).No Noncompliance Noted.Major Areas Inspected:Storage,Use & Protection of Natl Security Info & in-transit Physical Security Measures
ML20204A004
Person / Time
Site: 07001426
Issue date: 05/01/1986
From: Ennis J, Mcguire D, Tobin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20204A000 List:
References
70-1426-86-01, 70-1426-86-1, NUDOCS 8605090263
Download: ML20204A004 (1)


Text

r-

-SAFEGUARDS INFORMATION

  • [pHog UNITED STATES g,

D NUCLEAR REGULATORY COMMISSION o

p

~' g'n REGtON11 g

,j

' 101 MARIETT A STREET, N.W.

ATLANTA, GEORGI A 30323 0,

..... #',4

.MAY 0 51986 Report No. 70-1426/86-01 Licensee: Transnuclear, Inc.

One North Broadway White Plains, NY 10601 Docket No. 70-1426 Facility Name:

Transnuclear. Inc., Falls Church, VA, and the German Military Representative, Dulles International Airport, VA Inspection Conducted:

March 24, 1986 (Falls Church, VA)

April 2, 1986 (Dulles International Airport, VA) h 4/l'l/f/[3 Inspectors: I 1111 i J. Tobin, Senior Security Inspector Ohte Signed

/rx 4h2/E y9. Enni, Physical Security Inspector Date Signed ier

).

<//!/b Approved by:

v (T. ft.~McGuire, Chief, Physical Security Section " 'Dste Signed Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards

SUMMARY

Scope:

This routine, announced inspection entailed four inspector-hours inspecting the storage, use, and protection of National Security Information at the Falls Church facility and six inspector hours inspecting in-transit physical security measures for an export shipment of strategic special nuclear material.

Results:

The licensee was found to be in compliance with NRC requirements in the areas examined.

g5on85! 898Bdr C

El: CLOSURE CONTAINS SAFCGUADDS INFORLfATION UP013 SEPARATION THIS PAGE IS DECONTROLLED.

SAFEGUARDS INFORMATION