ML20203P993
| ML20203P993 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/22/1986 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-36357-EEVB, DER-86-06, DER-86-6, NUDOCS 8605080491 | |
| Download: ML20203P993 (2) | |
Text
=
7 A
FZCaVE0 9 'O n Arizona Nuclear Power Project P.o. Box 52034 e PHOENIX, ARIZONA 85072-2034 ISM APR 28 PH I: 22-ANPP-36357-EEVB/DRL-92.11 April 22, 1986 REGiullV V F U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention:
Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects Palo~ Verde Nuclear Generating Station (PVNGS)
Unit 3 Docket No. 50/530
Subject:
Time Extension For Report - DER 86-06 A 50.55(e) Potentially Reportable Deficiency Relating To Ir. adequate Wiring Lug Terminations File: 86-006-216; 86-026-056; D.4.33.2
Reference:
(A) Telephone Conversation between R. C. Sorenson and D. R. Larkin on February 21, 1986 (Initial Reportability - DER 86-06)
(B) ANPP-35655, dated March 25, 1986 (Interim Report - DER 86-06)
Dear Sir:
The NRC was notified of a potentially reportable deficiencf in Reference (A),
and an Interim Report was transmitted by Reference (B). At that time, it was estimated that a Final Report would be available by April 25, 1986.
Due to the extensive investigation and evaluation required it is now expected that this information will be finalized by May 16, 1986, at which time a complete report will be submitted.
There is no new information or change to the laterim Report at this time.
Very truly yours, 8605080491 860422 _
PDR ADOCK 05000530
. a. Van Br t, Jr.
Lj PDR Executive Vice President Project Director EEVB/DRL/ldf cc: See Page Two ldf/011/ DER 86-06 16-J 7
~. -.
y.
k '..
.,e ANPP-36357-EEVB/DRL-92.11' April 22, 1986 v
- j
^
- . DER 86 Time Extension Mr. D. F. Kirsch Acting Director Page 2 u
9;z cc:
J. M. Taylor, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 A. C. Gehr (4141)-
R. P. Zimmerman- (6295)
Records Center Institute of Nuclear Power Operations
' ~ '
1100 Circle 75 Parkway - Suite 1500 Atlanta, Gergia 30339 N
4 1
4
' 5f e.
e i -
~
r
. /.
t
- b i
^
I Idf/009/ FORM-7 I
7i--
w, w -
m t y
,et-et AV i y(f 4.
-.'ew,y
- i r-,
w a 7 v---
er