f If Arizona Nuclear Power Project b [Ill N f] l: y P.o. box 52034 e PHOENIX, ARIZONA 85072-2034 ANPP-36358-EEVB/DRL-92.11 April 22, 1986 TCiON v RF U. S. Nuclear Regulatory Commissilon Region V 1450 Maria Lane - Suite 210
" Walnut Creek, CA 94596-5368
' Attention:
Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects Palo Verde Nuclear Generating Station (PVNGS)
Unit 3 Docket Nos. 50/530
Subject:
Time Extension For Report - DER 86-08 A 50.55(e) Potentially Reportable Deficiency Relating To Grinnell #2 Sway Strut Clamp Interference File: 86-006-216; 86-026-056; D.h.33.2
Reference:
(A) Telephone Conversation between.A. Hon and D. R. Larkin on February 26, 1986.
(Initial Reportability - DER 86-08)
(B) ANPP-35713, dated March 26, 1986 (Interim. Report - DER 86-08)
Dear Sir:
The NRC was notified of a Potentially Reportable Deficiency in Reference ( A) and an Interim Report was issued in Reference (B). At that time, it was estimated that a Final Report would be available by April 29, 1986.
Due to information still required, from the vendor, to formulate the correc-tive action plan, a time exten'sion to May 23, 1986 is needed to finalize our re@rt.
s There is no new information or change to the Interim Report at this time.
Very truly yours,
. E. Van Bru t, Jr.
Executive Vice President Project Director EEVBJr/DRL/ldf ldf/xm-DER 86-08 8605000489 860422
'h
.KJ7
a.
_ y,..
~ April 22, 1986 DER 86 Time Extension Mr. D. F. Kirsch-Acting Director Page 2 cc:
J. M. Taylor, Director Office of Inspection and Enforcement
.U. S. Nuclear Regulatory Commission Washington, D. C.
20555 A. C. Gehr (4141)
R. P..Zimmerman-(6295)
. Records Center.
Institute of Nuclear Power Operations-1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339
.