Interim Deficiency Rept DER 86-08 Re Grinnell 2 Sway Strut Clamp in Interference.Initially Reported on 860226.Due to Info Required from Vendor,Time Extension to 860523 Needed to Finalize Rept
ML20203P992
Person / Time
Site: Palo Verde 
Issue date: 04/22/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-36358-EEVB, DER-86-08, DER-86-8, NUDOCS 8605080489
Download: ML20203P992 (2)


Text

I~

y,-

x.

f If Arizona Nuclear Power Project b [Ill N f] l: y P.o. box 52034 e PHOENIX, ARIZONA 85072-2034 ANPP-36358-EEVB/DRL-92.11 April 22, 1986 TCiON v RF U. S. Nuclear Regulatory Commissilon Region V 1450 Maria Lane - Suite 210

" Walnut Creek, CA 94596-5368

' Attention:

Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects Palo Verde Nuclear Generating Station (PVNGS)

Unit 3 Docket Nos. 50/530

Subject:

Time Extension For Report - DER 86-08 A 50.55(e) Potentially Reportable Deficiency Relating To Grinnell #2 Sway Strut Clamp Interference File: 86-006-216; 86-026-056; D.h.33.2

Reference:

(A) Telephone Conversation between.A. Hon and D. R. Larkin on February 26, 1986.

(Initial Reportability - DER 86-08)

(B) ANPP-35713, dated March 26, 1986 (Interim. Report - DER 86-08)

Dear Sir:

The NRC was notified of a Potentially Reportable Deficiency in Reference ( A) and an Interim Report was issued in Reference (B). At that time, it was estimated that a Final Report would be available by April 29, 1986.

Due to information still required, from the vendor, to formulate the correc-tive action plan, a time exten'sion to May 23, 1986 is needed to finalize our re@rt.

s There is no new information or change to the Interim Report at this time.

Very truly yours,

. E. Van Bru t, Jr.

Executive Vice President Project Director EEVBJr/DRL/ldf ldf/xm-DER 86-08 8605000489 860422

'h

.KJ7

a.

_ y,..

ANPP-36358-EEVB/DRL-92.11

~ April 22, 1986 DER 86 Time Extension Mr. D. F. Kirsch-Acting Director Page 2 cc:

J. M. Taylor, Director Office of Inspection and Enforcement

.U. S. Nuclear Regulatory Commission Washington, D. C.

20555 A. C. Gehr (4141)

R. P..Zimmerman-(6295)

. Records Center.

Institute of Nuclear Power Operations-1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339

.