__

(

ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) during this test. Within 5 minutes after completing this l

24-hour test, perform Specification 4.8.1.1.2g.6)b),*

8)

Verifying that the auto-connected loads to each diesel generator do not exceed 5750 kW;**

l 9)

Verifying the diesel generator's capability to:**

l a)

Synchronize with the offsite power source while the

. generator is loaded with its emergency loads upon a simulated restoration of offsite power, b)

Transfer its loads to the offsite power sourr.e, and c)

Se restored to its standby status.

10) Verifying that with the diesel generator operating in a test mode, connected to its bus, a simulated Safety Injection signal cverrides the test mode by: (1) returning the diesel generator to standby operation, and (2) automatically energizing the emergency loads with offsite power;**

l

11) Verifying that the fuel transfer valve transfers fuel from each fuel storage tank to the day tank of each diesel via the in-stalled cross-connection lines;
12) Verifying that the automatic load sequence timer is OPERABLE with the interval between each load block within the tolerances given in Table 4.8-2;
13) Verifying that the voltage and diesel speed tolerances for the accelerated sequencer permissives are 92.5 i 1% and 98 + 1%,

respectively, with a minimum time delay of 2

  • 0.2 s; and
14) Verifying that the following diesel generator lockout features prevent diesel generator starting only when required:

a)

Turning gear engaged, or b)

Maintenance mode.

"If Specification 4.8.1.1.2g.6)b) is not satisfactorily completed, it is not necessary to repeat the preceding 24-hour test.

Instead, the diesel generator may be operated at greater than or equal to 5600 kW but less than or equal to 5750 kW for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or until operating temperature has stabilized.

    • This surveillance need.not be performed until prior to entering HOT SHUTDOWN following the Unit 1 first refueling.

CATAWBA - UNITS 1 & 2 3/4 8-6 Amendment No. 7 (Unit 1) 8605080400 860501 PDR ADOCK 05000413 P