Proposed Tech Spec Table 6.2-1,reflecting Exemption from Requirement to Have Two Senior Reactor Operators on Shift
ML20203P804
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 05/01/1986
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML20203P798 List:
References
NUDOCS 8605080181
Download: ML20203P804 (2)


Text

.. .-..

ATTACHMENT Consumers Power Company Big Rock Point Plant Docket 50-155 PROPOSED TECHNICAL SPECIFICATION PAGE CHANGES May 1, 1986 8605000181 860501

~

PDR ADOCK 05000155 P PDR 1 Page IC0386-0058-NLO4

r- }

Table 6.2-1 MINIMUM SHIFT CREW COMPOSITION POSITION NUMBER OF INDIVIDUALS REQUIRED TO FILL FOSITION Power Refueling Shutdown or-Operation Operation Cold Shutdown SS 1 1 1 RO 2 1 1 A0 2 2 1 SS - Shif t Supervisor with a Senior Reactor Operators License RO - Individual with a Reactor Operators License AO - Auxiliary Operator The Shift Crew Composition may be one less than the minimum requirements of Table 6.2-1 for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the Shift Crew Composition to within the minimum requirements of Table 6.2-1. This provision does not permit any shift crew position to be unmanned upon shift change due to an oncoming shift crewman being late or absent. An on-call Technical Advisor is required and must be able to arrive on-site within one hour. During any absence of the Shif t Supervisor from the

, control room during power operation an individual with a Reactor Operators License shall be designated to assume the control room command function.