ML20203P793

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/86-15 & 50-457/86-13 on 860305-21 & Notice of Violation
ML20203P793
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 05/02/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20203P794 List:
References
NUDOCS 8605080169
Download: ML20203P793 (2)


See also: IR 05000456/1986015

Text

r-

.

.

MAY 2

1986

Docket No. 50-456

Docket No. 50-457

Comonwealth Edison Company

ATTH: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. Z. Falevits

and R. Mendez of this office on March 5 through 21, 1986, of activities at

.

Braidwood Station, Units 1 and 2, authorized by NRC Construction Pemits

No. CPPR-132 and No. CPPR-133 and to the discussion of our findings with

Mr. D. L. Shamblin at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice. A written response

is required.

In accordance with 10 CFR 2.790 of the Consnission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

'We will gladly discuss any questions you have concerning this inspection.

Sincerely,

C. W h 1 S hrad by C.' J. " = V m

  1. 169 860

56

J. J. Harrison, Chief

ADOCK O

PDR

Engineering Branch

PDR

G

En:losures:

1.

Notice of Violation

2.

Inspection Reports

No. 50-456/86015(DRS ;

No. 50-457/86013(DRS

See Attached Distribution

RIII

RIII

RIII

RIII

R

'g-

.

da

M t4

iM[v

Mendez/kst

Fa evits

Muffett

Little

H rrison

sh/ew

6hu

(L

s/2/eo

g.

,,

d of

-

.

9

Commonwealth Edison Company

2

h5AY 2

1986

Distribution

cc w/ enclosures:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Superintendent

P. L. Barnes, Regulatory-

Assurance Supervisor

DCS/RSB (RIDS)

Licensing Fee Management Branch

- Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr. , Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

-E. Chan, ELD

J. Moore, ELD

G.. Berry, ELD

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB-

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB