s
..
..
APR 3 01986
Docket No. 50-440
Docket No. 50-441
The Cleveland Electric Illuminating
Company
ATTN:
Mr. Murray R. Edelman
Vice President
Nuclear Group
Post Office Box 5000
Cleveland, OH 44101
Gentlemen:
This refers to the routine safety inspection conducted by Mr. W. Snell and
others of this office on April 14-17, 1986, of activities at Perry Nuclear Power
Plant, Units 1 and 2, authorized by NRC Facility Operating License No. NPF-45
and Construction Permit No. CPPR-149 and to the discussion of our findings with
Mr. A. Kaplan and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
However, weaknesses were identified which will need corrective
action by your staff. These weaknesses are summarized in the attachment to
this letter " Exercise Weaknesses." As required by 10 CFR Part 50, Appendix E,
IV.F, any weaknesses that are identified must be corrected.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and any response to this letter will be placed
in the NRC Public Document Room.
8605000122 860430
ADOCK 05000440
G
S
'
.
.
.
The Cleveland Electric Illuminating
2
Company
APR 3 0 886
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
ga agned by SP 8*'#
W. D. Shafer, Chief
Radiological Protection Branch
Enclosures:
1.
Exercise Weaknesses
2.
Inspection Reports
No. 50-440/86009(DRSS);
No. 50-441/86003(DRSS)
cc w/ enclosures:
J. J. Waldron, Manager, Perry
Plant Technical Department
M. D. Lyster, Manager, Perry Plant
Operations Department
L. O. Beck, General Supervising
Engineer, Nuclear Licensing and
Fuel Management Section
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Terry J. Lodge, Esq.
James W. Harris, State of Ohio
Robert H. Quillin, Ohio
Department of Health
RIII
RIi:I
RII
RIII
R
Ak
ih(
S St
Sne
Knop
S
r
er/kst
$
l$5
h
V&
I
VEf
.--
.-
.
. - -
. - .
-
- -
.. -
-
.- .-- -
-
?
.
4
EXERCISE WEAKNESSES
i
1.
The notification for the declaration of an Alert to the Coast Guard
was not made during the required timeframe of 15 minutes. (50-440/86009-01;
50-441/86003-01) (Paragraph 5.a.2).
2.
The inplant team responding to the simulated injured / contaminated man did
not provide complete information to the Control Room regarding the accident
site situation. (50-440/86009-02; 50-441/86003-02) (Paragraph 5.a.3).
3.
. Procedural criteria for downgrading an Emergency Action Level (EAL) to a
lesser level were not considered in downgrading the Action Level, and an
unapproved form was utilized in recovery planning. (50-440/86009-03;
50-441/86003-03) (Paragraph 5.b.1).