Forwards Safety Insp Rept 50-354/86-18 on 860303-14.No Violation Noted.Steps Taken to Correct Violations Noted in Verified.Actions Planned Prior to Next Containment Integrated Leak Rate Test Will Be Tracked
ML20203P424
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 04/23/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
Public Service Enterprise Group
Shared Package
ML20203P425 List:
References
NUDOCS 8605070224
Download: ML20203P424 (2)


See also: IR 05000354/1986018

Text

- .

g

h --

w

p _ , y

-

.

i

' APR 2 31986

.

Docket No. 50-354

Public Service Electric & Gas Company

ATTN: Mr. C. A. McNeill, Jr.

Vice President - Nuclear

Post Office Box 236

Hancocks Bridge, New Jersey 08038

Gentlemen:

Subject:

Inspection Report No. 50-354/86-18

This refers to the routine safety inspection conducted by Mr. D. Florek of'this

office on March 3-14, 1986, at the Hope Creek Generating Station, Hancocks

Bridge, New Jersey, of activities authorized by NRC License No. CPPR-120 and

tc the discussions of our findings held by Mr. Florek with yourself and other

members pf your staff at tne conclusion of the inspection, and to a subsequent

telephone discussion between Mr. Florek and A. Giardino on March 17, 1986.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector,

f

04 bmW also verified the steps you have taken to correct the violation

'

o aught to your attention in the enclosure to our letter dated January 31, 1986.

We have no further questions regarding your action at this time.

However, we

note that certain required actions for this issue are planned to be completed

prior to the next containment integrated leak rate test, presently scheduled

for 1989. These actions will be tracked to completion by the NRC under unre-

solved Item 50-354/86-18-01.

1

Within the scope of this inspection, no violations were observed.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

i

Sincerely,

Original S!gned By r

Loo H. Ecttenhausen

MStewartD.Ebneter, Director

j

Division of Reactor Safety

,

Enclosure: HRC Region I Inspection Report No. 50-354/86-18

1

l

l

OFFICIAL RECORD COPY

IR HC 86-18 - 0001.0.0

i

04/16/86

8605070224 860423

PDR

ADOCK 05000354

G

PDR

-

-

- - .

- -

- - .

_ - - _

~l.

~

, ,

.

Public Service Electric & Gas Company 2

.

cc w/ encl:

P. R. H. Laudrieu, Vice President - Engineering (Newark)

R. S. Salvesen, General Manager, Hope Creek Operations

A. E. Giardino, Manager, Station Quality Assurance

R. L. Mitti, General Manager, Nuclear Assurance and Regulation

A. J.- Pietrofitta, General Manager, Power Production Engineering,

Atlantic Electric

L. A. Reiter, General Manager - Licensing and Reliability

Rebecca A. Green, Bureau of Radiation Protection

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Je'r'sey

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief

j

RI

I:DRS

[r(id'djh/fi

E

Bettenhausen

4/f/86

4/4/86

4/Z586

0FFICIAL RECORD COPY

IR HC 86-18 - 0002.0.0

04/04/86

s