Text
.
_
_
.
l
COT 2 219%
Alabama Power Company
ATTN: Mr. R. P. Mcdonald
Senior Vice President
P. O. Box 2641
Birmingham, AL. 35291-0400
Gentlemen:
SUBJECT: REPORT N0. 50-348/86-14 AND 50-364/86-14
The NRC Systematic Assessment of Licensee Performance (SALP) Board has completed
l
its periodic evaluation of the performance of your Farley facility.
This
facility was evaluated for the period January 1, 1985 through July 31, 1986. The
results of the evaluation are docume.nted in the enclosed SALP Board Report. This
report will be discussed with you at the Farley facility on October 21, 1986, at
10:30 a.m.
The performance of your Farley facility was evaluated in the functional areas of
plant operations, radiological controls, maintenance, surveillance, fire
protection, emergency preparedness, security, outages, training, quality programs
and administrative controls affecting quality, and licensing activities.
A high level of performance has continued at your Farley facility. There was an
aggressive management posture towards nuclear safety.
Strengths were noted by
the SALP Board in the areas of plant operations, radiological controls,
maintenance, surveillance, fire protection, outages, and licensing activities.
Any comments you have concerning our evaluation performance of your facility
should be submitted to this office within 30 days following the date of our
meeting at your Farley facility.
Your comments (if any), a summary of~ our
October 21, 1986 meeting, and my disposition of your comments will be issued
as an appendix to the enclosed SALP Board Report.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
\\sWD.01A
J. Nelson Grace
Regional Administrator
Enclosure:
SALP Board Report - Farley Units 1 and 2
cc w/ encl: (See page 2)
'
8610270248 861022
ADOCK 0500
8
of
Il
l
.
- -
._ _
. _ _ _
. -.
.
0072atygg
Alabaraa Power Coinpany
2
cc w/ encl:
W. O. Whitt, Executive Vice President
J. D. Woodard, General Manager -
Nuclear Plant
W. G. Hairston, III, General Manager -
Nuclear Support
J. W. McGowan,-Manager-Safety Audit
and Engineering Review
J. K. Osterholtz, Supervisor-Safety
'
Audit and Engineering Review
bcc w/ enc 1:
NRC Resident Inspector
Document Control Desk
State of Alabama
E. Reeves,RIIProject Manager, NRR
M. Ernst,
D. Verrelli, RII
H. Dance, RII
L. Modenos, RII
Distribution List C
I
/
R I,
RI"
RII
I-
RII
RII
f
rell',10/f/86p[Ahson
jy /ggg
o
os:jd
Ha e
DV
S
/
0//p/86
10//6 /86
10/t 6 /86
10/[g/86 10/g/8
dl2 6