Forwards SALP Repts 50-348/86-14 & 50-364/86-14 for Jan 1985 - Jul 1986
ML20203P222
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/22/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO., ARKANSAS POWER & LIGHT CO.
Shared Package
ML20203P223 List:
References
NUDOCS 8610270248
Download: ML20203P222 (2)


See also: IR 05000348/1986014

Text

_ _

.

.

l

COT 2 219%

Alabama Power Company

ATTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL. 35291-0400

Gentlemen:

SUBJECT: REPORT N0. 50-348/86-14 AND 50-364/86-14

The NRC Systematic Assessment of Licensee Performance (SALP) Board has completed

l

its periodic evaluation of the performance of your Farley facility. This

facility was evaluated for the period January 1, 1985 through July 31, 1986. The

results of the evaluation are docume.nted in the enclosed SALP Board Report. This

report will be discussed with you at the Farley facility on October 21, 1986, at

10:30 a.m.

The performance of your Farley facility was evaluated in the functional areas of

plant operations, radiological controls, maintenance, surveillance, fire

protection, emergency preparedness, security, outages, training, quality programs

and administrative controls affecting quality, and licensing activities.

A high level of performance has continued at your Farley facility. There was an

aggressive management posture towards nuclear safety. Strengths were noted by

the SALP Board in the areas of plant operations, radiological controls,

maintenance, surveillance, fire protection, outages, and licensing activities.

Any comments you have concerning our evaluation performance of your facility

should be submitted to this office within 30 days following the date of our

meeting at your Farley facility. Your comments (if any), a summary of~ our

October 21, 1986 meeting, and my disposition of your comments will be issued

as an appendix to the enclosed SALP Board Report.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

\sWD.01A

J. Nelson Grace

Regional Administrator

Enclosure:

SALP Board Report - Farley Units 1 and 2

cc w/ encl: (See page 2)

'

8610270248 861022

PDR ADOCK 0500 8 of

l

Il

._ _ . -.

. _ _ - -

. _ _ _

.

0072atygg

Alabaraa Power Coinpany 2

cc w/ encl:

W. O. Whitt, Executive Vice President

J. D. Woodard, General Manager -

Nuclear Plant

W. G. Hairston, III, General Manager -

Nuclear Support

J. W. McGowan,-Manager-Safety Audit

and Engineering Review

J. K. Osterholtz, Supervisor-Safety

'

Audit and Engineering Review

bcc w/ enc 1:

NRC Resident Inspector

Document Control Desk

State of Alabama

E.

M. Reeves,RIIProject

Ernst, Manager, NRR

D. Verrelli, RII

H. Dance, RII

L. Modenos, RII

Distribution List C

I

/

R I, RI" RII I- RII RII f

o os:jd

10/t 6 /86

Ha e DV S /

rell',10/f/86p[Ahson

0//p/86

jy /ggg

10/[g/86 10/g/8 10//6 /86

dl2 6