Discusses 860414 Mgt Meeting Re Util Readiness Review Modules,Including Electrical Equipment,Electrical Cables & Terminations & Electrical Supports.List of Attendees Encl
ML20203P052
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/18/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
References
NUDOCS 8605060304
Download: ML20203P052 (5)


Text

-.

-. ~. -

O Go<J Mlt L

7 APR 181986 t

Georgia Power Company ATTN: Mr. R. J. Kelly Executive Vice President P. O. Box 4545

~

Atlanta, GA 30302 Gentlemen:

j_

SUBJECT:

MEETING SUPNARY - V0GTLE FACILITY - DOCKET NO. 50-424 This refers to the management meeting conducted at your request in the NRC i

Region II Office'on April 14, 1986.

This meeting was held to brief the NRC on the Vogtle Readiness Review Modules entitled, " Electrical Equipment",

" Electrical Cables and Terminations," and " Electrical Supports."

It is our opinion that this meeting was beneficial and has provided a compre-hensive overview of the Vogtle Readiness Review Program and, specifically, the i

modules presented.

These in-depth presentations will better enable the NRC to conduct its evaluations of this module.

1 In accordance with Section 2.790 of NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning these matters, we will be pleased to 4

l discuss them.

Sincercly, ORIG lNAL SIGNED B6

]

J. NELSON GRACC J. Nelson Grace Regional Administrator Enclosures 1.

Attendance List 2.

Sumary of Issues Discussed cc w/encis:

(See page 2) i l

8605060304 860418 PDR ADOCK 05000242 A

PDR

'I i

i 0(

APR 18 26

~

s Georgia Power Company 2

gc w/encis:

vR. E. Conway, Senior Vice President &

/ - Project Director

/D.O. Foster,VicePresident, Project

/ Support

/P.D. Rice,VicePresident, Project

/ Engineering vR. H. Pinson, Vice President, Project

./ Construction v J. T. Beckham, Vice President &

/. General Manager - Operations V R. A. Thomas, Vice President,

/ Licensing V C. W. Hayes, Vogtle Quality

/ Assurance Manager VW. C. Ramsey, Manager -

/ Readiness Review

/G. B. Bockhold, General Manager, f Nuclear Operations v L. T. Gucwa,. Chief Nuclear Engineer M. H. Googe, Project Construction Manager E. D. Groover, Quality Assurance Site Manager -

_j Construction VJ. A. Bailey, Project Licensing

/ Manager vG. F. Trowbridge, Esq., Shaw,

-Pittman, Potts and Trowbridge

. W. Churchill, Esq., Shaw, Pittman, Potts and Trowbridge E. L. Blake, Jr., Esq., Shaw,

'}J.E. Joiner,Troutman, Sanders, Pittman, Potts and Trowbridge Lockerman and Ashmore

. G. Ledbetter, Commissioner, Department of Human Resources

,C. H. Badger, Office of Planning

}D.Kirkland,III, Counsel, and Budget Office of the Consumer's Utility

)

Council

\\/ D. C. Teper, Georgians Against Nuclear Energy cc w/encls:

(Cont'd on page 3)

)

s APR 181986 Georgia Power Company 3

cc w/encls: (Cont'd)

/M.B.Margulies,Esq., Chairman, Atomic Safety and Licensing Board

/ Panel V 0. H. Paris, Administrative Judge

-Atomic Safety and Licensing Board

/ Panel t/G.' A. Linenberger, Jr., Administrative Judge Atomic Safety and Licensing Board Panel B. P. Garde, Citizens Clinic Director, Government Accountability Project

- tcc w/encls:

. Reis, ELD

. M. Hill, IE v. Miller, NRR J. Brach, E00 M. Sinkule, RII E. Christnot, RII vflRC Resident Inspector Document Control Desk State of Georgia R

RII RII RI p

E.Christnot:dm MSinkule VBrownlee eyes Walke 1

4/ f/8 4/g /86

-4//7/86 4/r//86 4/q/86

/

APR 181986 ENCLOSURE 1 LIST OF ATTENDEES Vogtle Readiness Review Meeting April 14, 1986, at 12:30 p.m.

U. S. Nuclear Regulatory Commission

'~

L. A. Reyes, Deputj Director, Division of Reactor Projects (DRP)

V. L. Brownlee, Chief, Reactor Projects Branch (RPB) 3, DRP M. V. Sinkule, Chief, Reactor Projects Section (RPS) 3C, DRP T. E. Conlon, Chief, Plant Systems Section (PSS) Division of Reactor Safety (DRS)

W. H. Rankin, Technical Assistant, Division of Raciation Safety and Safeguards (DRSS)

E. F. Christnot, Project Engineer, RPS 3C, DRP J. W. York, Senior Resident inspector, RPS 1B, DRP M. D. Hunt, Reactor Inspector, DRS E. N. Fields, NRR J. W. Thompson, NRR W. E. Scott, IE Georgia Power Company D. O. Foster, Vice President-Project Support Vogtle W. C. Ramsey, Manager, Readiness Review C.

n'. Hayes, Vogtle Quality Assurance Manager B. Harbin, Manager Quality Control

0. Butum, Duputy Project Engineering Manager J. E. Seagraves, Readiness Review Discipline Manager G. C Dall, Readiness Review Discipline Manager H. Hartka, Senior Nuclear Engineer-Licensing

77--

i-APR 181986 s

e

/~

~

ENCLOSURE 2 Surmary of Issues Discussed I'

The three electrical modules presented were discussed in depth and a quality assurance assessment was also presented.

It was noted that several Level I Findings, " violation of licensing commitments, project procedures or engineering requirements with indication of safety concern," were identified in the modules.

Allf hree modules did not address the Independent Design Review (IDR), Section 7.

t The IDR will be submitted at a later date and is designated as Module 22 for tracking purposes.

GPC representatives were responsive to questions of clarification submitted verbally by the NRC attendees. They also indicated that additional documentation as to the selections sample sizes, the number of attributes involved and methodology used to make module assessments is available at the Vogtle site.

J