ML20203N484
| ML20203N484 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 04/24/1986 |
| From: | Olshinski J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20203N486 | List: |
| References | |
| NUDOCS 8605050447 | |
| Download: ML20203N484 (2) | |
Text
_
m WIIno 7
April 24, 1986 Tennessee Valley Authority ATTN: Mr. S. A. White Manager of Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Gentlemen:
SUBJECT:
SEQUOYAH LICENSED OPERATOR READINESS REPORT 50-327/0L-86-01 The NRC administered simulator evaluations during the weeks of February 17 and February 24, 1986, to 24 randomly selected licensed operators and senior operators.
At the conclusion of the site v: sit, preliminary findings on the simulator evaluations were discussed with thase members of your staff identified in the enclosure.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will be placed in NRC's Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
)
(Original signed by JA01shinski)
John A. Olshinski Deputy Regional Administrator for TVA
Enclosure:
Evaluation Report 50-327/0L-86-01 cc w/ encl:
R. J. Johnson, Chief Nuclear Training Branch
/P.R.Wallace,PlantManager
,J.H.Noe, Supervisor, Operations Training bec w/ encl:
/SeniorResidentInspector
, Vd. N. Grace, RII T. Reidinger, RIII
,/vR.Higgins,RIII
. Shiraki, DHFT:NRR Project Manager, NRR
- Vp. R. Denton, NRR
- VH. L. Thompson, NRR
- vd. M. Taylor, IE g50gggg{ggggggg7
. B. Hayes, 01 y
PDR S. R. Connelly, OIA State of Tennessee d0peratorLicensingBranch,DHFT:NRR Document Control Desk kC. Stahle, NRR
- j
- RII
- RII
- RII
.;)* RII
- RII
- SEE PREVIOUS WMDean JFMunro CAJulian AFGibson SWeise CONCURRENCE 04/ /86 04/ /86 04/ /86 04/ /86 04/ /86
- - -pff g
\\
April 24, 1986 y
Tennessee Valley Authority ATTN: Mr. S. A. White 4
Manager of Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Gentlemen:
SUBJECT:
SEQUOYAH LICENSED OPERATOR READINESS REPORT 50-327/0L-86-01 The NRC administered simulator evaluations during the weeks of February 17 and February 24, 1986, to 24 randomly selected licensed operators and senior operators.
At the conclusion of the site visit, preliminary findings on the simulator evaluations were discussed with those members of your staff identified in the enclosure.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will be placed in NRC's Public Document Room.
Should you hava any questions concerning this letter, please contact us.
Sincerely, (Original signed by JA01shinski)
John A. Olshinksi Deputy Regional Administrator for TVA
Enclosure:
Evaluation Report 50-327/0L-86-01 cc w/ encl:
R. J. Johnson, Chief Nuclear Training Branch P. R. Wallace, Plant Manager C. H. Noe, Supervisor, Operations Training bec w/ enc 1:
Senior Resident Inspector T. Reidinger, RIII R. Higgins, RIII C. Shiraki, DHFT:NRR Project Manager, NRR H. R. *enton, NRR H. L. Thompson, NRR J. M. Taylor, IE B. B. Hayes, 01 S. R. Connelly, 0IA State of Tennessee Operator Licensing Branch, DHFT:NRR Document Control Desk i
RII RI RII RI' RI AfGbson WM M ro CAJ n
SW 04hT/86 4/ 7/86 04/23/86 04G)/86 04/[y/86
,