Text
.
\\t.fQ
.
APR 211986
Georgia Power Company
ATTN: Mr. R. J. Kelly
Executive Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: REPORT NOS. 50-424/86-14 AND 50-425/86-08
On February 24-28, 1986, NRC inspected activities authorized by NRC Construction
Permit Nos. CPPR-108 and CPPR-109 for your Vogtle facilities. At the conclusion
of the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
r
representative records, interviews with personnel, and observation of activities
L
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Your attention is invited to unresolved items identified in the inspection
report. These matters will be pursued during future inspections.
Should you have any questions concerning this letter, please contact us.
Sincerely,
M
Virgil L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-424/86-14
and 50-425/86-08
'
cc w/ encl:
(See page 2)
8605050389 860421
ADOCK 05000424
G
/{
\\
___-_ - _ _ _- __ _ _ po t
m
APR 211986
"
.
Georgia. Power Company
2
{ccw/ enc 1:
4 R. E. Conway, Senior Vice President &
[
Project Director
ND. O. Foster, Vice President, Project
i Support
JP. D. Rice, Vice President, Project
Engineering
)R. H. Pinson, Vice President, Project
Construction
dJ. T. Beckham, Vice President &
4.GeneralManager-Operations
A. Thomas, Vice President,
g
Licensing
NC. W. Hayes, Vogtle Quality
Assurance Manager
. C. Ramsey, Manager -
1
Readiness Review
NG. B. Bockhold, General Manager,
Nuclear Operations
4L. Gucwa, Manager, Nuclear Safety
\\
and Licensing
M. H. Googe, Project
g Construction Manager
E. D. Groover, Quality
-
Assurance Site Manager -
1 Construction
%1. A. Bailey, Project Licensing
d . Manager
G
F. Trowbridge, Esq., Shaw,
1
Dittman, Potts and Trowbridge
dB. W. Churchill, Esq., Shaw,
g
Pittman, Potts and Trowbridge
4E. L. Blake, Jr., Esq., Shaw,
4 .Pittman, Potts and Trowbridge
J
E. Joiner, Troutman, Sanders,
,
d Lockerman and Ashmore
J. G. Ledbetter, Commissioner,
Department of Human Resources
dC.H. Badger,OfficeofPlanning
h .and Budget
D Kirkland, III, Counsel,
Office of the Consumer's Utility
N
Council
4. C. Teper, Georgians Against
Nuclear Energy
(cc w/enci cont'd - see page 3)
.
-
-
-
-
-
-
-
- -
-
- -
-
I
.,e
APR 211986
.
.
Georgia Power Company
3
b (cc w/enci cont'd)
M. B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
Panel
4Dr. O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
/ Panel
4G. A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
g
Panel
N B. P. Garde, Citizens Clinic, Director
Government Accountability Project
- cc w/ encl:
. Reis, ELD
. M. Hill, IE
gM. Miller,NRR
h.Brach,EDO
M. Sinkule, RII
. Rankin, RII
NRC Resident Inspector
Document Control Desk
State of Georgia
l
,
[g
_
_ _ _ _ _ _ .
TDGibbons:cdg
TEconlon
A Her
/ ~/86
$/ /86
/j /86
l
,
i
e