Forwards Insp Repts 50-424/86-14 & 50-425/86-08 on 860224- 28.No Violation or Deviation Noted
ML20203N407
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/21/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20203N410 List:
References
NUDOCS 8605050389
Download: ML20203N407 (3)


See also: IR 05000424/1986014

Text

.

\\t.fQ

.

APR 211986

Georgia Power Company

ATTN: Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: REPORT NOS. 50-424/86-14 AND 50-425/86-08

On February 24-28, 1986, NRC inspected activities authorized by NRC Construction

Permit Nos. CPPR-108 and CPPR-109 for your Vogtle facilities. At the conclusion

of the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

r

representative records, interviews with personnel, and observation of activities

L

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Your attention is invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

Should you have any questions concerning this letter, please contact us.

Sincerely,

M

Virgil L. Brownlee, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-424/86-14

and 50-425/86-08

'

cc w/ encl:

(See page 2)

8605050389 860421

PDR

ADOCK 05000424

G

PDR

/{

\\

___-_ - _ _ _- __ _ _ po t

m

APR 211986

"

.

Georgia. Power Company

2

{ccw/ enc 1:

4 R. E. Conway, Senior Vice President &

[

Project Director

ND. O. Foster, Vice President, Project

i Support

JP. D. Rice, Vice President, Project

Engineering

)R. H. Pinson, Vice President, Project

Construction

dJ. T. Beckham, Vice President &

4.GeneralManager-Operations

A. Thomas, Vice President,

g

Licensing

NC. W. Hayes, Vogtle Quality

Assurance Manager

. C. Ramsey, Manager -

1

Readiness Review

NG. B. Bockhold, General Manager,

Nuclear Operations

4L. Gucwa, Manager, Nuclear Safety

\\

and Licensing

M. H. Googe, Project

g Construction Manager

E. D. Groover, Quality

-

Assurance Site Manager -

1 Construction

%1. A. Bailey, Project Licensing

d . Manager

G

F. Trowbridge, Esq., Shaw,

1

Dittman, Potts and Trowbridge

dB. W. Churchill, Esq., Shaw,

g

Pittman, Potts and Trowbridge

4E. L. Blake, Jr., Esq., Shaw,

4 .Pittman, Potts and Trowbridge

J

E. Joiner, Troutman, Sanders,

,

d Lockerman and Ashmore

J. G. Ledbetter, Commissioner,

Department of Human Resources

dC.H. Badger,OfficeofPlanning

h .and Budget

D Kirkland, III, Counsel,

Office of the Consumer's Utility

N

Council

4. C. Teper, Georgians Against

Nuclear Energy

(cc w/enci cont'd - see page 3)

.

-

-

-

-

-

-

-

- -

-

- -

-

I

.,e

APR 211986

.

.

Georgia Power Company

3

b (cc w/enci cont'd)

M. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

Panel

4Dr. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

/ Panel

4G. A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

g

Panel

N B. P. Garde, Citizens Clinic, Director

Government Accountability Project

- cc w/ encl:

. Reis, ELD

. M. Hill, IE

gM. Miller,NRR

h.Brach,EDO

M. Sinkule, RII

. Rankin, RII

NRC Resident Inspector

Document Control Desk

State of Georgia

l

,

[g

_

_ _ _ _ _ _ .

TDGibbons:cdg

TEconlon

A Her

/ ~/86

$/ /86

/j /86

l

,

i

e