ML20203M902
| ML20203M902 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 09/02/1986 |
| From: | Steptoe P COMMONWEALTH EDISON CO., ISHAM, LINCOLN & BEALE |
| To: | Guild R BUSINESS & PROFESSIONAL PEOPLE FOR THE PUBLIC INTERES |
| References | |
| CON-#386-582 OL, NUDOCS 8609050154 | |
| Download: ML20203M902 (1) | |
Text
ISHAM, LINCOLN & BEALE COUNSELORS AT LAW 00(K[ Q[I USNRC THREE FIRST NATIONAL PLAZA 3
8
- " Ti::n::;':'::'
LI E STREET J
=
>-s>
c 9,o,,*gg==
" " " ' " ~'
INCLUDING REUSEN 4 PROCTOR 0FFICE Of SLUntIARY DOCK E T IN G hifufpowgTICUT, VENUE, a W
""E"'"
BR ANCH,,,ju,i;E tieg,,,
n 202 833-9730 TO CALL WRITER DIRECT BY MESSENGER
' 558' September 2, 1986 Robert Guild, Esq.
Business and Professional People for the Public Interest 109 North Dearborn Street Suite 1300 Chicago, Illinois 60602 Re:
In the Matter of Commonwealth Edison Company (Braidwood.1tation, Units 1 and 2),
Docket Nos. 50-456 and 50-457
Dear Bob:
Enclosed are Bates stamped copies of the engineer-ing drawings referred to in CSR packages CBP-034, CPH-104, and EIN-144.
Sargent & Lundy have marked the drawings with red ink to indicate the components which are the subject of the CSR observations.
In addition, I enclose additional correspondence related to the implementation of the PTL over-inspection program, and revisions 2 through 9 of the PTL site instruction for the overinspectim program.
Revision 2 was the first revision to be implemented.
In pr9paration for these hearings S&L has performed engineering evaluations of certain items that were declared out of scope for purposes of t.ae CSR.
Commonwealth Edison has not relied on those evaluations in its rebuttal testimony, but they are available for your review, upon reasonable notice, at S&L's offices in Chicago.
8609050154 E60902
/
PDR ADOCK 05000456 0
/;
td 4
PPS:es P
. lip P.
tepto enc.
cc Service List (w/out enclosures) 0SO 3
.