RO 86-002:on 860627,loose Parts Monitoring Sys Inoperable in Excess of Tech Spec Action Statement 3.3.7.9.a 30-day Limit. Caused by Inadequate Calibr.New Amplifier Cards Installed & Channels Recalibr
ML20203L266
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 08/05/1986
From: Salvesen R
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
86-002, 86-2, NUDOCS 8608250414
Download: ML20203L266 (4)


Text

. .

asRC P.rm 30s U 8. NUCLE ATg E E1ULATDRY COMMisetON N AprROvt0 Oese 40 3:304tos

'"'S etsi m LICENSEE EVENT REPORT ILER)

PACILITV NAast II) DOCKET NUMSER (2) PAGE 431 Hope Creek Generating Station olstololo13ISI4 1 l0Fl Of 3 TITLE tel Inoperability of Loose Parts Monitoring System Due to Calibration Problems-Soncial Rnrnrt R6-OO2

~ EVENT DATE Ist - LER NUtdeER 104 REPORT DATE 171 OTHER FACILITIES INVOLVED ist

    • P ACiLITY hauts MONTH DAY YEAR YEAR = L* ' 7 MONTM DAY YEAR DOCKET NUMetRig) 0 151010101 l l

~ ~

0l6 2l7 8 6 Nl A ll l 0l 8 0l5 8l 6 oisiotoio I l OPERMM THIS REPORT le sugaseTTED PUReUANT TO THE REOUIREMENTS OF 10 CFR $. (Ch.c. .ae .e m.r. .t the f.u..wa,i (11)

MOOE W 20 4e216) 20.40sta) 80.73taH2Hav) 73.71(b>

R 30.40steH1H6 e6 3eleH1) 30.73(all2Hvl 73.711e) t108 l l 30.40 4sH1HB) so.3eleH2) 00.73teH2Hva) X 07,wEgS eg,Agg 20.40 4aH1Hm) .0.73deH2HG 00.73teH2HemHA) J66Al so .eswHiHN, so n wH2H.)

seni.n2H.mHei Special 20.gei.HiHw sonwH2Hei seni.H2H-) Report LICENSEE CONT.*CT FOR THIS LER (121 NAME TELEPHONE ivuMSER AREA CODE Karen M. Head, Technical Staff Engineer 610l9 313191 -I 512 l 319 COMPLETE ONE LINE FOR EACM COMPONENT FAILURE DEsCRieti3 IN TMit REPORT (13)

R TA CAUSE SYSTEM COMPONENT "^"N("O yy "fo e,PR s' CAUSE SYSTEM COMPONENT "#Ng$C-7y pq X II I l l l RI 3l 41 4 N i i i l i i l I I I I I I I I I l I I I SUPPLEMENTAL REPORT EXPECTED lies MONTH DAY YEAR YES for v .s. e.nm.o.l. 6JrPCCTLO SUtat!S$10N DA TEI NO l l l A TRACT a - ,uo u. ,.. ,,,l . .. ,ii.)

On June 27, 1986 at 2315 the Loose Parts Monitoring System was declared inoperable. At that time Technical Specification Action Statement 3.3.7.9.a was entered which allows thirty days to repair the malfunction. During that period Public Service Electric & Gas worked with the vendor Rockwell International to troubleshoot and repair the inoperable channels. Although the vendor stated that it was usual to experience difficulties at this stage of operations, the erroneous information for calibration and tuning of the system together with out-of-spec components supplied by Rockwell hindered troubleshooting efforts. As a result, the channels were not repaired in the thirty days allowed by the Technical Specifica-tions. The cause for the system inoperability was due to an ,

inadequate calibration. The vendor installed new amplifier cards and system operability will be proven through the successful completion of surveillance tests. Presently all twelve channels have been successfully calibrated and the system is expected to be declared operational by the end of the week. This Special Report is being submitted in accordance with Technical Specifications 3.3.7.8 and 6.9.2.

e608250414 86080D PDR ADOCh OB000M4 5 PDR "sYE"*

  • l _ _. . . _ . ._- _. _ . _ _ . . - _ . . _

NRC F.re 306A U 8. NUCLE 12 KEIULATORY COMMISSION LICENSEE EVENT REPORT (LER) TEXT CONTINUATION AP aovEo oMa No asso-oto.

EXPIRES 8/3 115 PactLITY NAME til DOCKET NUMGER 423 LER NUMGER 16) PAGE (3) vsaa "t'llP. -

"'J*.O Hope Creek Geneerating Station o ls jo jo jo l 3l 5! 4 NA 0p 0F i

l l l 0l3 rw 12m ~ . n M o uc r.m ama sm PLANT AED SYSTEM IDENTIFICATIDN General Electric - Boiling Water Reactor Loose Parts Monitoring System (EIIS Designation: II)

DACEGACUED During December of 1985 the Loose Parts Monitoring System was successfully preoperationally tested with the exception of a printer which required circuit modification. Rockwell International, the system's vendor, was present during this testing. Although the preop was completed satisfactorily, it must be noted that the tests were performed when the system was not filled with water. As a result, with the reactor systems filled and the reactor critical, several loose parts alarm channels activated. The system was declared inoperable on June 27, 1986 and Technical Specification Action Statement 3.3.7.8.a was entered.

The statement allows thirty days to repair the malfunction and declare the system OPERABLE. The action statement specifies "With one or more loose-part detection system channels inoperable for more than 30 days, prepare and submit a Special Report to the Commission...".

DESCRIPTIDE DE TBE EVENT The vendor arrived onsite to install a printer modification and to correct the alarming condition of the Loose Parts Monitoring System channels. The circuit modification to the printer corrected the problem identified during preoperational testing. The alarm circuits were modified at the direction of the vendor, but the problem persisted. Under vendor direction amplifier cards were then modified. This, however, did not correct the problem and the vendor returned to his office for an intensive research and development erfort. By this time, the thirty days ha.d passed and the Loose Parts Monitoring System remained inoperable. On July 27, 1986, the thirty days had elapsed and a Special Report was required.

ANALYSIS DE TEE EVENT Since the preset configuration of the system was determined when the reactor systems were not filled with water and conditions were not indicative of an operating plant, the alarm setpoints and the calibrations would have to be changed when operations began. The vendor stated it was common for the system to experience difficulties at this stage of operations. In this case, the field signal strength was too high for the preset configuration of the amplifier cards. This produced false alarms indicating loose g,,o M 2 .

7 NecF.em 3esA u s muCLEAfl REGULLTORY COMMISSION LICENSEE EVENT REPORT (LER) TEXT CONTINUATION AreaovEo ous No siso-oio.

EMPIRES 8>3115 P ACILITV Naase (1) DOCKET NUMSER 423 Ltm NUMetR 16) # AGE 131

  • EAa RGP "'5*.O Hope Creek Generating Station

,anC r asiaw nn o ls o o o 3l5l4 Nl A -

l l l 0[3 OF:

0 l3 rixt ru -. M ANALYSIS DE EyflE (CON'T) parts. It was discovered that the vendor had supplied erroneous informacion for calibration and tuning of the system as well as out-of-spec components. In addition circuit board modifications were all performed under the vendor's direction and still failed to produce satisfactory results. Troubleshooting activities were also complicated by a change in the calibration tools. It was realized that a new type instrument was required in order to calibrate the channels properly. Although there was a diligent effort to repair the Loose Parts Monitoring SysF 7 within the required time frame, the described difficulties preve.ited the system from being declared OPERABLE. As a result, the vendor returned to his office to resolve the amplifier card problem and develop new calibration tools.

CORRECTIVE ACTIDBE Corrective actions include the installation of new amplifier cards, the development of instruments to be used in channel calibrations, and the performance of surveillance tests to prove the system OPERABLE. The vendor provided new amplifier cards and they were installed at his direction. The new tools were utilized in the channel calibrations. To date all twelve channele have been calibrated successfully and the system is expected to be declared operational by the end of the week.

This event posed no threat to the public health and safety and this report is being submitted pursuant to the requirements of Technical Specificationi 3.3.7.8 and 6.9.2.

Sincere 3y, gk ( ll,$o $ W H. S. Salvesen General Manager Hope Creek Operations KMH:bar SORC Mtg.86-188 g ,,ou.

O PSEG Pubhc Setvice Electric and Gas Cornpany P.O. Box L Hancocks Bridge, New Jersey 08038 Hope Creek Operations August 5, 1986 Regional Administrator USNRC Region 1 631 Park Avenue King of Prussia, PA 19406

Dear Sir,

SPECIAL REPORT 86-892 HOPE CREEK GENERATING STATION DOCKET NO.58-354 In compliance with Technical Specfication 3.3.7.8 and 6.9.2, this 10 day report is being sumbitted to you.

Sincerely yours,

, p[,h ln S'b'

, R. S. Salvesen General Manager Hope Creek Operations KMH:bar SORC Mtg.86-188 i