ML20203L112

From kanterella
Jump to navigation Jump to search
Forwards Page Changes to 860618 Submittal of Final Draft Tech Specs for Review.Certification That Tech Specs Consistent W/Fsar & SER Requested 2 Wks Prior to Date Facility Will Be Ready for Licensing.W/O Encl
ML20203L112
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/21/1986
From: Butler W
Office of Nuclear Reactor Regulation
To: Spangenberg F
ILLINOIS POWER CO.
References
NUDOCS 8608220453
Download: ML20203L112 (1)


Text

DISTRIBUTION w/o encl.

Docket;Filef M0'Brien Docket No. 50-461 NRC PDR ACRS(10)

LPDR CSchulten w/o PD#4 Rdg.

encl.

RBernero Mr. Frank A. Spangenberg Pirfo, 0GC Manager-Licensing and Safety BGrimes Clinton Power Station Edordan P.O. Box 678 JPartlow Mall Code V920 NThompson Clinton, Illinois 61727 BSiegel

Dear Mr. Spangenberg:

SUBJECT:

CHANGES TO FINAL DRAFT TECHNICAL SPECIFICATIONS Re:

Clinton Power Station On June 18, 1986 we forwarded to you a copy of the final draft Technical Specifications for Clinton. Since that time, the staff has been coordinating the resolution of the comments it has received both from you and from members of the staff. These comments have been reviewed and incorporated as changes (datedAugust 20,1986) to the final draft Technical Specifications. A copy of the pages which have been changed is enclosed.

You are requested to review these changes and certify that the Clinton Tech-nical Specifications, as modifiau b the enclosed pages, are consistent with the Clinton FSAR, the staff SFR and supplements thereto, and the as-built facili ty. You should provide your c?rtification at least two weeks prior to the date on which the facilit.) will be ready for licensing.

Sincerely, DWatssedbr Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

As stated cc w/ enclosure:

See next page 1

PD#4/D B}iegel:lb Butler j /g/86

/gg/86 86052204S3 G60821 PDR ADOCK 05000461 PDR