ML20203K910

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/86-26 & 50-457/86-21 on 860721-25.No Violation Noted
ML20203K910
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 08/14/1986
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20203K912 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8608220257
Download: ML20203K910 (2)


See also: IR 05000456/1986026

Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

n.

.

'AtlG 141986

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. C. F. Gill

of this office on July 21-25, 1986, of activities at Braidwood Nuclear Power

Station, Units 1 and 2, authorized by NRC Construction Permits No. CPPR-132

and No. CPPR-133 and to the discussion of our findings with Mr. J. Jasnosz

and others of your staff.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and enclosed inspection report will be placed in the NRC Public

Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

~"OrIginaT signed W w.L Mef

W. D. Shafer, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosure: Inspection Reports

No. 50-456/86026(DRSS); and

No. 50-457/86021(DRSS)

See Attached Distribution OW

RII

=4

Gil/mj).

ag RII RI

/ 7 BK)I

% <

RII

l lf(

Grant Ga n er Si

hl Y/b /

8605200257 OWO14

PDR ADOCK OZ00406

g een

_ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ - _ _ _ _ _ _

. _ . _ . ._ __ --

'

,

Commonwealth Edison Company 2

,

AUG t 41986

i

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

4

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

'

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr. , Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

!

'

Division

E. Chan, ELD

i J. Moore, ELD

G. Berry, ELD

l J. Stevens, NRR

j The Honorable Herbert Grossman, ASLB

I

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

i

i

i

l

l

l

!

l

l

- . - -. -. . _ . _ - - - - _ - _ - - _ _ - . . . -