Monthly Operating Rept for Jul 1986
ML20203K384
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 07/31/1986
From: Phillips M, Salvesen R
Public Service Enterprise Group
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
NUDOCS 8608200266
Download: ML20203K384 (6)


Text

_ . - . _ _ - _ _ _ _ _ - _ _ _ _

l HOPE CREEK GENERATING STATION MONTHLY OPERATING

SUMMARY

JULY 1986 Since initial criticality the station has been involved in the low power physics testing and maintaining Technical Specification Surveillance currency. On July 21, 1986, the NRC voted to issue the full. power license and on July 25 the station received the license. ' On July 28, and again on July 29, the turbine was rolled to 1800 RPM. Synchronization of the turbine and the generator occurred on August 1, 1986.

KMH:tib l

l

, 8609200266 860731 PDR ADOCK 05000354 R PDR *

[ t\\

s OPERATING DATA REPORT DOCKET NO. 50-354 _ _ _ _ _ _

UNIT Hope Creek _ Gen. __ Station DATE August __141_1_9_8_6 COMPLETED BY M._A. Phillip_s, TELEPHONE 609-339-3_738_

OPERATING STATUS 1 REPORTING PERIOD . Julv _ GROSS HOURS IN REPORTING PERIOD 744

2. CURRENTLY AUTHORIEED POWER LEVEL.(MWt) 3293 __

MAX. DEPEND. CAPACITY (MWe-Net)_ 10_67 DESIGN ELECTRICAL RATING (MWe-Net) __1067_ _

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net) _ _
4. REASONS FOR RESTRICTION (IF ANY)

THIS YR TO MONTH DATE CUMULATIVE

5. NO. OF HOURS REACTOR WAS CRITICAL 600.4 631.9 _631.9
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE O 0 0
8. UNIT RESERVE SHUTDOWN HOURS 0 0_ 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 45,000 45,000 45,000
19. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 _

0

11. NET ELECTRICAL ENERGY GENERATED (MWH) 0 0 0
12. REACTOR' SERVICE FACTOR N/A
13. REACTOR AVAILABILITY FACTOR N/A
14. UNIT SERVICE FACTOR N/A __ __ _ _ _ _

l 15. UNIT AVAILABILITY FACTOR N/A

16. UNIT CAPACITY FACTOR (Using Design MDC) N/A l

j 17.. UNIT CAPACITY FACTOR (Using Design MWe) N/A j

18. UNIT FORCED OUTAGE DATE N/A

{ 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION) : 5 (See attached) i 29. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

l'

21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 6/15/86_ 6/28/86 l

INITIAL ELECTRICITY 7/26/a6 8/1/86_

COMMERCIAL OPERATION 11/24/86

~ __ __

SCHEDULED SHUTDOWNS (ITEM 19)

TYPE DATE DURATION 1.. Post Heatup Outage 8/1/86 4 days

2. LOP Test - Scram 8/18/86 2 days
3. Shutdown Outside 8/31/86 4.5 days Control Room - Scram
4. MSIV Isolation - Scram- 11/12/86 2 days
5. Load Rejection - 11/17/86' 4.5 days Scram

T AVERAGE DAILY UNIT POWER LEVEL DOCKET.NO. 50-354 UNIT Hope Creek Gen.. Station DATE August 14, 1986 COMPLETED BY M. A. Phillips TELEPHONE bC9-339-3738 MONTH Jttly 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 2g 0 5 0 21 0 l

6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 lg 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 3g 0 15 0 31 0 1

16 0 i

.- . OPERATING DATA REPORT UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-354 UNIT NAME Hope Creek Gen. Statio3

! DATE August 14, 1986 COMPLETED BY M. A. Phillips REPORT MONTH July TELEPHONE 609-339-3738 METHOD OF SHUTTING DOWN THE TYPE REACTOR OR F FORCED DURATION REASON REDUCING CORRECTIVE ACTION /

NO. DATE S SCHEDULED (BOURS) (1) POWER (2) COMMENTS 7/1/86 F 18.7 A 2 Continuation from June. Shut-down to perform troubleshoot- )

ing on the Reactor Manual Control System.

7/4/86 F 35.8 A 3 With RPS Channel B manual scram due to level transmitter discrepancies, received spur-fous APRM up.cale signal and reactor scram.

7/12/86 F 44.1 A 2 Steam line radiation :nonitors failed causing steam line isolation. Manual scram due to pressure & power excursion.

1/19/8E F 16.2 6 3 Operator ranged 2 IRMs down -

instead of up causing scram.

7/25/86 F 11.5 8 3 Surveillance Procedure on Tur-bine stop/ control valve. Trips reactor on low water level.

7/30/86 F 17.3 A 3 EHC Backup Power Supply Fall-ure resulting in Reactor Scras (low level).

SUMMARY

Note that the shutdowns were mistakenly numbered in the June Report.

?

i t

J 0.PSEG Public Service Electric and Gas Company P.O. Box L Hancocks Bridge, New Jersey 08038 Hope Creek Operations August 14, 1986 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Dear Sir:

MONTHLY OPERATING REPO4.f HOPE CREEK GENERATING STATION UNIT 1 DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for July are being forwarded to you.

Sincerely yours, R. S. Salvesen General Manager Hope Creek' Operations KMH:bar Distribution CC Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406 Enclosures i